Forum quick links
Can FSC Product Certification replace invoices?
CI-2009 MRc7:Certified Woodposted by Mauricio Ramirez on
Hello. I'm pursuing this credit on a project in Mexico City.
To what extent we provide Tenant fitout
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Indochine Engineering VN on
Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office.
How to document a non-LEED-certifiable building?
NC-2009 EAp2:Minimum Energy Performanceposted by Anya Fiechtl on
Our project includes a separate non-LEED certifiable building with no regularly occupied space and no FTE, that houses the renewable energy and ground source heat pump systems for the main building
Naturally ventilated open cafeteria
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Magda Aghababyan on
Dear all, We have a fully naturally ventilated open cafeteria (No walls, only roof mounted on top of columns) that is occupied only for max about 2 hrs a day during 1hr lunch break and two tea bre
Separate CxA's for Fundamental and Enhanced Cx?
NC-2009 EAc3:Enhanced Commissioningposted by Timothy Casper on
In a traditional design-bid-build project, does the CxA need to be responsible for both fundamental and enhanced Cx? Or can these credits be split between two CxA's?
Coffee Shop
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Kathryn West on
Gosh, this credit is never 100% in the "yes" column when you have a building that is not a traditional office space. I have a coffee shop in my building.
building is eligible or not
CS-2009 IEQc7:Thermal Comfort—Designposted by Ron Dean on
I am bit confused about the requirements of the Thermal comfort-desing’ credit for C&S Can you please help me on figure out if my building is eligible or not. The building is mechanical ventil
Residential high rise with school at the base
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Ilana Judah on
We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels.
Do we include Non-certifiable structure in Building gross area?
NC-2009 MPR7:Must comply with a minimum building area to site area ratioposted by Anya Fiechtl on
We have a project with a main facility and a separate non-occupied, non-certifiable equipment/storage building.
Vehicular control - Tire washing control
NC-2009 SSp1:Construction Activity Pollution Preventionposted by LEED Pro Consultant on
Hello all, I have a question regarding the control measure for the control for all the vehicles leaving the project, the most common is cleaning all the vehicles (washing the tires) before leaving