Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Can FSC Product Certification replace invoices?

CI-2009 MRc7:Certified Wood
posted by  Mauricio Ramirez  on 

Hello. I'm pursuing this credit on a project in Mexico City.

2
LEED AP BD+C
SINERGI Integrated Building Sciences, LLC
LEEDuser Basic Member
0 thumbs up
Fri Aug 7, 2015, 3:30 pm

To what extent we provide Tenant fitout

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Indochine Engineering VN  on 

Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Aug 7, 2015, 2:10 pm

How to document a non-LEED-certifiable building?

NC-2009 EAp2:Minimum Energy Performance
posted by  Anya Fiechtl  on 

Our project includes a separate non-LEED certifiable building with no regularly occupied space and no FTE, that houses the renewable energy and ground source heat pump systems for the main building

7
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Fri Aug 7, 2015, 1:11 pm

Naturally ventilated open cafeteria

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Magda Aghababyan  on 

Dear all, We have a fully naturally ventilated open cafeteria (No walls, only roof mounted on top of columns) that is occupied only for max about 2 hrs a day during 1hr lunch break and two tea bre

3
Fri Aug 7, 2015, 12:31 pm

Separate CxA's for Fundamental and Enhanced Cx?

NC-2009 EAc3:Enhanced Commissioning
posted by  Timothy Casper  on 

In a traditional design-bid-build project, does the CxA need to be responsible for both fundamental and enhanced Cx? Or can these credits be split between two CxA's?

8
Default Avatar
Tetra Tech
LEEDuser Basic Member
3 thumbs up
Thu Aug 6, 2015, 4:06 pm

Coffee Shop

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Kathryn West  on 

Gosh, this credit is never 100% in the "yes" column when you have a building that is not a traditional office space. I have a coffee shop in my building.

3
Wed Aug 5, 2015, 7:54 pm

building is eligible or not

CS-2009 IEQc7:Thermal Comfort—Design
posted by  Ron Dean  on 

I am bit confused about the requirements of the Thermal comfort-desing’ credit for C&S Can you please help me on figure out if my building is eligible or not. The building is mechanical ventil

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Aug 5, 2015, 6:19 pm

Residential high rise with school at the base

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Ilana Judah  on 

We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 5, 2015, 2:32 pm

Do we include Non-certifiable structure in Building gross area?

NC-2009 MPR7:Must comply with a minimum building area to site area ratio
posted by  Anya Fiechtl  on 

We have a project with a main facility and a separate non-occupied, non-certifiable equipment/storage building.

6
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Wed Aug 5, 2015, 2:31 am

Vehicular control - Tire washing control

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  LEED Pro Consultant  on 

Hello all, I have a question regarding the control measure for the control for all the vehicles leaving the project, the most common is cleaning all the vehicles (washing the tires) before leaving

4
Tue Aug 4, 2015, 10:03 pm