IEQc6.1 - space type category

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  S. Sachs  on 

For IEQc6.1-Controlability of Systems-Lighting, Do concourse spaces in a metro station fall into the regularly occupied space category?

3
Thu Nov 5, 2015, 3:21 am

Green Cleaning in a Semiconductor Fab???

EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Program
posted by  David Gibney  on 

I posed this question for a NC-2009 project a week ago and received no replies, so thought I'd re-post it here: I'm working on a semiconductor fab that is part of a LEED campus project.

7
Tue Nov 3, 2015, 10:35 pm

Water Sense Calculator

NC-v4 WEp1:Outdoor water use reduction
posted by  Robyn Dowsey  on 

The calculator says that acceptable irrigation types for landscaped turf grass is only drip and fixed spray but allows rotors in the drop down- can rotors be used or not - Kind of urgent Thanks

3
Default Avatar
Owner
Eco-Build Strategies LLC
LEEDuser Basic Member
15 thumbs up
Tue Nov 3, 2015, 6:55 pm

WEp1 Credit Resources - Water Use Reduction Calculator

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susannah Goddard  on 

I have just come across the Water Use Reduction Calculator tool in the credit tools for WEp1. Do most people use this to demonstrate compliance?

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Nov 3, 2015, 4:23 pm

Airconditioning for process requirement

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

Hi, We are working on a tablet manufacturing facility which is fully air conditioned (Only cooling, no heating requirement).

3
Tue Nov 3, 2015, 2:21 pm

Base Model using Option D

NC-2009 EAc5:Measurement and Verification
posted by  Kalyan Nishtala  on 

This is the first time I am dealing with this credit. I am confused with what the base mode (using option D) entails.

6
Tue Nov 3, 2015, 2:12 pm

50% or Residents and Buildings with Access

ND-v2009 SLLc3:Locations with reduced automobile dependence
posted by  Sara Zoumbaris  on 

My question is in regards to the 50% requirement of residents and the # of weekday trips.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Nov 2, 2015, 6:15 pm

Bus Stops Planned, Not Yet Built

ND-v2009 SLLc3:Locations with reduced automobile dependence
posted by  Sara Zoumbaris  on 

I am hoping someone can confirm for me whether planned bus stops which are not yet official/ in place but are guaranteed, may be included for credit achievement?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Nov 2, 2015, 6:14 pm

Site lighting outside the LEED project boundary?

NC-2009 EAp2:Minimum Energy Performance
posted by  Anya Fiechtl  on 

Our project is within a larger property owned by the same entity, and some illuminated paths and roads extend beyond our LEED project boundary, so we're referencing CIR #10236, which allows expand

3
Architect
Buro Happold
LEEDuser Basic Member
55 thumbs up
Mon Nov 2, 2015, 5:49 pm

Alternative Compliance in lieu of LEED Tables

NC-2009 IEQp1:Minimum IAQ Performance
posted by  kevin connolly  on 

Has anyone been successful using the alternative compliance path and submitting their own ASHRAE 62.1 calculation/spreadsheets in lieu of using the built in LEED or 62MZCalc form? We would rather

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Nov 2, 2015, 1:21 pm