Forum quick links
Resort Hotel and Condo
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Zehren on
I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date.
U-value for Green Roof using Appendix A
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Dear forum, We have a project where the proposed design includes a green roof, but there is no insulation. The roof has a metal deck below the green structure.
Building Energy Metering - Third Party Source
CS-v4 EAp3:Building-level energy meteringposted by Sean Hogan on
Hi, We have commenced a project seeking LEED V4 certification and wish to know more sharing metered information through third party sources.
Dedicated shuttle connecting to public transport interfaces
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Ricardo Sá on
I'm working on a project that is located approx. 0,75 mile from a bus interface, 1,6 mile from a train station and 2,6 mile from city centre.
Winter resort
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by John Zehren on
Our project is located in a winter ski resort village with heavy snowfall. The likelihood of someone biking here in the winter is slim.
Carpet in LEED v4
NC-v4 EQc2:Low emitting materialsposted by Ben Campbell on
Is it just me, or is there not much to work with in terms of compliant carpet for Low-Emitting Materials in LEED v4?
Hybrid Car Parking Shadin (structural and vegetation)
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Francis Porter on
Hi Everybody, I intended to meet SS 7.1 Heat Island Effect - Nonroof via Option 2 by covering all car parking spaces in vegetative shade.
EBOM Campus and Performance Periods
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Kath Williams on
How is the performance period determined when submitting EBOM campus credits under master site? Individual buildings will not be submitted for 8 more months but the campus credits are ready now.
Assembled Wood Materials
NC-v4 EQc2:Low emitting materialsposted by Mike Miller on
We manufacture Architectural wood doors made with wood composites which are CARB NAF and wood composites which are not included in the CARB requirements, i.e., structural composite lumber.
Historical Building
NC-2009 EAp2:Minimum Energy Performanceposted by Khaled Fouda on
I am working on renovating a NYC historical building. per NYC Energy Conservation Code 101.4.2, this project is exempted from meeting the wattage allowance.