Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

CSR- GRI Report

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  LEED Pro Consultant  on 

I have a question regarding option 1. The GRI report for a product does not address the raw material supplier extraction location.

2
LFA, RESET ASP, WELL Faculty, LEED Fellow
Wight & Company
LEEDuser Expert
6 thumbs up
Mon Jan 4, 2016, 3:05 pm

Water Consumption Outside LEED Boundary

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Aswin M  on 

We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women).

8
Default Avatar
Conserve Consultants Private Limited
LEEDuser Basic Member
5 thumbs up
Mon Jan 4, 2016, 4:52 am

Eyeball Audits as Backup for Commingled Diversion

Homes-v2008 MRc3:Waste management
posted by  Michelle Rosenberger  on 

Hi Ann, This is a repost from NC, MRc2. I am hoping that you can shed some light on this. Our Seattle region has a very developed state regulated construction waste diversion infrastructure.

2
founder/principal
Design AVEnues LLC
LEEDuser Expert
8 thumbs up
Thu Dec 31, 2015, 11:04 pm

VOC limits?

Retail-CI-v2009 IEQc4.6:Low-emitting materials - ceiling and wall systems
posted by  Erica Downs  on 

I am new to IDC Retail... hopefully others have some experiece? i have the IDC Retail Supplement, and it really does not say anything at all other than the language provided above.

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Dec 31, 2015, 5:54 pm

Expected Waste Volume

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Saud Abdul Rasheed  on 

Hi all, Our project is a commercial tower mainly with offices and few retail shops. The total area is 272,500 sq. ft. and we have provided waste collection area of 620 sq. ft. in the basement.

4
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Thu Dec 31, 2015, 3:45 am

Invoice Requirements

CS-2009 MRc6:Certified Wood
posted by  Charles Nepps  on 

Per the the FAQ's above: "GBCI had required invoices for all wood products, but has switched to requiring only invoices for FSC certified products, per the April 2008 FSC memo, which states that al

3
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Wed Dec 30, 2015, 9:37 pm

Where is the line again?

NC-2009 MRc7:Certified Wood
posted by  Daniel Hartsig  on 

There are specific inclusions for bamboo and cork (neither are wood) in MRc7, but it is still unclear where to draw the line between solid, wood chip and wood fiber products that still look like wo

2
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Wed Dec 30, 2015, 9:34 pm

Exam room compliance

Healthcare-v2009 IEQc6.1:Controllability of systems - lighting
posted by  Todd Bundren  on 

what are the requirements for IEQc6.1 as it relates to exam rooms in an outpatient cancer center?

2
Wed Dec 30, 2015, 9:15 pm

PERCENTAGE OF MALE USING URINAL

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  JAMES MARK CHAN  on 

is there any guidance about percentage of male expected to use urinal.

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Wed Dec 30, 2015, 5:48 pm

Pre-Rinse Spray Valve Before 11/1/2011 addenda

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Crina Bosch   on 

Above states "If your project is registered after the 11/1/2011 addenda release then the pre-rinse spray valve flow rate must be 1.6 gpm or less in order to comply with the prerequisite.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Dec 30, 2015, 4:48 pm