CSR- GRI Report
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by LEED Pro Consultant on
I have a question regarding option 1. The GRI report for a product does not address the raw material supplier extraction location.
Water Consumption Outside LEED Boundary
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Aswin M on
We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women).
Eyeball Audits as Backup for Commingled Diversion
Homes-v2008 MRc3:Waste managementposted by Michelle Rosenberger on
Hi Ann, This is a repost from NC, MRc2. I am hoping that you can shed some light on this. Our Seattle region has a very developed state regulated construction waste diversion infrastructure.
VOC limits?
Retail-CI-v2009 IEQc4.6:Low-emitting materials - ceiling and wall systemsposted by Erica Downs on
I am new to IDC Retail... hopefully others have some experiece? i have the IDC Retail Supplement, and it really does not say anything at all other than the language provided above.
Expected Waste Volume
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Saud Abdul Rasheed on
Hi all, Our project is a commercial tower mainly with offices and few retail shops. The total area is 272,500 sq. ft. and we have provided waste collection area of 620 sq. ft. in the basement.
Invoice Requirements
CS-2009 MRc6:Certified Woodposted by Charles Nepps on
Per the the FAQ's above: "GBCI had required invoices for all wood products, but has switched to requiring only invoices for FSC certified products, per the April 2008 FSC memo, which states that al
Where is the line again?
NC-2009 MRc7:Certified Woodposted by Daniel Hartsig on
There are specific inclusions for bamboo and cork (neither are wood) in MRc7, but it is still unclear where to draw the line between solid, wood chip and wood fiber products that still look like wo
Exam room compliance
Healthcare-v2009 IEQc6.1:Controllability of systems - lightingposted by Todd Bundren on
what are the requirements for IEQc6.1 as it relates to exam rooms in an outpatient cancer center?
PERCENTAGE OF MALE USING URINAL
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by JAMES MARK CHAN on
is there any guidance about percentage of male expected to use urinal.
Pre-Rinse Spray Valve Before 11/1/2011 addenda
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Crina Bosch on
Above states "If your project is registered after the 11/1/2011 addenda release then the pre-rinse spray valve flow rate must be 1.6 gpm or less in order to comply with the prerequisite.