SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Shad Traylor on
SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if
Open Space Accessibility
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ilana Judah on
We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.
Amount of offset in multi tenanted building
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Peter Doo on
If tenants are individually metered, are the percentages of offset calculated on common area meter usage only?
Minimum Benefit to Achieve ID Credits
posted by Aaron Smith on
Hello, It seems to me I read at some point in time that the CaGBC wanted to see a minimum measurable benefit for Innovative Strategies.
New ASHRAE compliance path
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Melton on
Is this new compliance path likely to have any effect, direct or indirect, on prereq/credit documentation?
Underground Storage Chambers
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Marco Valerio Ceccotti on
To reduce runoff peak and quantity our project team used an embedded underground chambers system.
Registered Campus Projects, Approaches, Credits
posted by Ali Scander on
Hello, I just started a campus project. There is only one project registered on LEED online as "xxxx Campus" . I don't know which approach was taken for the credits.
demolition of existing facade
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
Some years ago the facade of an existing building was demolished. The facade was completely glazed. The structure of the building (pillars, beams) was conserved.
Process Energy Exceptional Calculation
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Hello, we are considering attempting the exceptional calculation method allowed in Section G2.5 for process load savings on a hospital project: the design is proposing equipment sterilization throu
Pump Room, STP Room & Guard Room Within LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aswin M on
We have a factory project to be registered under LEED New Construction.