Forum quick links
Service water heating for electric water heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Billy Condor on
Hello everyone, 1. Do the insulation requeriment of service water heating pipes (section 7.4.3 and table 6.8.3) apply for any material?
Waste Material reused "on-site"
NC-2009 MRc2:Construction Waste Managementposted by Adrian Arenas on
Construction Waste Management- Regarding waste material reused on site, our project is currently reusing wood and concrete on site.
Data loggers
EBOM-v4 EQc3:Thermal comfortposted by Patricia Andrasik on
How would one install data loggers to track thermal comfort in a dormitory?
Existing or new building threshold
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
There is a project which includes the renovation of an existing 40 ft high warehouse. The existing structure has only one (ground) floor of 30,000 sf.
Taking credit for DCV in car parks
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
Hello Marcus Sheffer, Refering to the LEED Interpretation 10371 related to taking credit for DCV in car parks, it is specified: 1) that the proposed case should be modeled such as that a minimum
U-Value / F-Factor
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
Hi, I have calculated the U-Value of a Slab on Grade Floor to be 0.12 (metric) using 100mm insulation.
Data Center - ASHRAE LPD
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- we are doing LEED NC project for data center which one is correct base case LPD for data center in building area method which lighting categories we take if we go with space by space m
LEED EBOM EA1 Case 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Magda Aghababyan on
I am working on a facility that cannot obtain an Energy Star score due to building type. I wish to use the Case 2 Option 2C using a set of comparable buildings.
Discharging the rainwater to municipality facilities.
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by mohamed magdy on
Does discharging the collected rainwater to municipality facilities will help with achieving the requirements for credit 6.1 & 6.2? we are following Case1 - path 1, we will reclaim the rainwat
Denied prerequisite
posted by Charalampos Giannikopoulos on
After two rounds of review EAp2 was denied although we reckon that we had totally addressed all comments of the preliminary review and additionally the issues described as outstanding in the final