CI-2009 WEc1:Water Use Reductionposted by Matthew Fortin on
I am in the process of certifying a CI space.
Fan Power and Fan Power Adjustment (FPA)
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project we are modeling, the following issues are still not quite clear for us and we'd appreciate any advice on the matter. Baseline system is 8.
Future Alternative Compliance Paths
Pilot-Credits PC14:Walkable Streetsposted by Douglas Flandro on
I would like to see some more options added to this credit to encourage walking on the project site such as tables and benches with solar powered charging stations, outdoor theaters, performance ar
NFRC Rated Fenestration
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
For the proposed model, can we refer to table A8.2 for U-factor of the window but refer SHGC and VLT to the manufacturing data (tested based with NFRC standard)?
Process - Transport Refinery Energy
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, Is there any precedent for being able to exclude fuel refinery energy from an energy model.
Through Connections
ND-v4 NPDc6:Connected circulation networkposted by Martine Desbois on
Hello Elliot, Following up on the last question, the reference guide refers to pedestrian and bicycle connection for culs-de-sac. From your response I assume it applies to all through connections.
C&D Waste Recycling Calculations for 200 yr-old bldg renovation
NC-2009 MRc2:Construction Waste Managementposted by Debra a. Lombard on
C&D Waste Recycling Calculations for 200 yr-old bldg renovation: This 200 yr-old brick building had a tremendous amount of old brick that was falling apart and needed to be taken out and re-po
requirements for secure bicycle storage?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Erin Holdenried on
Are racks or bike stands needed? I have a project with a designated area for bicycle storage.
Included wooded area in LEED boundary?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Erica Downs on
The project is on a college campus, and the site itself if previously developed.
exemplary performance
ND-v4 INc1:Innovationposted by Ian Scott on
I purchased my v4 reference guide last year and the listing of exemplary performance options differs in the table 5: Scorecard and policy areas and the information listed under each credit.