Topic | Recent |
---|---|
Solar cells and green roofCS-2009 SSc7.2: Heat island effect - roofposted by Mathilda Jonsson on May 9, 2011, 3:00 am
Hi Last reply: Petra Hajná, Jul 11, 2011, 10:06 am |
|
calculation assumptionsPilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Susan Walter on Jul 11, 2011, 10:04 am
Now that we're digging into the credit, we have questions on the assumed thickness for items that are a SF input. For example, we have mainly 12" thick foundation walls but a significant area... |
|
How to document glare control w/ prescriptive method?NC-2009 IEQc8.1: Daylight and views - daylightposted by Bonnie Chiu on Jul 1, 2011, 1:59 pm
I am documenting all the rooms in the building using the prescriptive method and I've checked the box that says 'the project has incorporated appropriate glare control devices...' in the credit... Last reply: Eddy Santosa, Jul 9, 2011, 12:18 am |
|
Multiple Shift FTEsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Ed Okon on Dec 23, 2010, 8:44 am
I currently work for a manufacturing plant and am curious as to how I should approach the calculations for this credit. We operate on multiple shifts so, do I calculate the baseline and "... Last reply: David Posada, Jul 8, 2011, 5:03 pm |
|
Reference building- garageCS-2009 EAc1: Optimize Energy Performanceposted by Adam Targowski on Jul 8, 2011, 8:24 am
In the building for which I'm preparing energy simulation, there's an underground garage which is heated only by used recirculated air from offices above. My question is if I should include it in... Last reply: Marcus Sheffer, Jul 8, 2011, 10:52 am |
|
ASHRAE compliance with naturally ventilated buildingNC-2009 EAc1: Optimize Energy Performanceposted by Jean Marais on Jul 8, 2011, 9:51 am
As per the guidelines, my baseline mechanical system is incorporated into the naturally ventilated design case model 1 to 1, as a priority 2 kind of system that kicks in when the naturally... |
|
pilot credits- we need your help!Pilot-Credits PC5: Preliminary Integrative Project Planning & Designposted by brendan owens on Aug 20, 2010, 10:46 amof a dedicated forum page on LEED Automation. Adrianna Schneider has already started such a page with a question she posted. Shall we take this conversation over there? Log in or register to post comments ... Last reply: Nadav Malin, Jul 8, 2011, 7:36 am |
|
Question Regarding RequirementsSchools-2009 IEQc8.2: Daylight and views - viewsposted by John Drigot on Sep 28, 2009, 11:49 am
I am trying to understand the requirements of this credit as it relates to the... Last reply: Sonrisa Lucero, Jul 7, 2011, 7:42 pm |
|
Re-application of Toxic PesticidesEBOM-2009 IEQc3.6: Green cleaning - indoor integrated pest managementposted by Andy Rhoades on Jul 27, 2010, 8:46 pm
We have a project that needs to use toxic pesticides to control the rodents. We have taken the LEED compliant procedure and notified the tenants 72 hours prior to the pesticide application. The... Last reply: Stephanie Graham, Jul 7, 2011, 4:23 pm |
|
LEED LCA CalculatorPilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Kelly Roberts on Jun 22, 2011, 5:30 pm
The link to the LEED LCA Credit Calculator does not appear to be working anymore. Does anyone know why this is? Last reply: Susan Walter, Jul 7, 2011, 3:04 pm |