FAQs about EAp2 :

Our building includes a large laboratory space. Can our project benchmark under the Labs21 program?

We have an international project and the space type is eligible for an Energy Star rating. Can we pursue Case 1 to demonstrate compliance given the recently released alternative compliance paths for international projects?

We have a number of buildings on a single campus that we would like to certify at the same time. Is it possible to benchmark the buildings at the campus level?

I have a mixed-use building and am wondering if it is possible to pursue the prerequisite through Case 1. How do we proceed?

We have a building that consists of two attached structures and it’s unclear if we have to consider it a single building or if it should be certified as two separate buildings and benchmarked accordingly. How should we proceed?

How long is an Energy Star label valid to use with a streamlined approach for Case 1?

Our building includes heavy process loads that significantly increase the overall energy use in the building. If we submeter these loads, can we exclude this energy use for benchmarking purposes?

We have installed submeters on our building but the utility bill includes energy use from several other buildings located on the same campus. How do we reconcile this during the LEED review process?

When is it possible to exclude up to 10% of the building from EAp2?

What do I do if the number of building occupants, operating hours, or vacant space changes during the performance period?

If you pursue the streamlined path for an Energy Star label, should the performance period for EAc6 match the 12-month time frame of the label?

How do I account for computers with multiple monitors on Portfolio Manager?

How should I treat vacant space on Portfolio Manager?

View answers »

Forum discussion

EBOM-2009 EAp2:Minimum Energy Efficiency Performance

International Project - Case 2 Option 1 or Option 2

Dear all, We have a retail mall in Malaysia targeting LEED EBOM v2009 rating. Under the portfolio manager our mall would fall under the "enclosed mall" space type, which is not eligible for the energy star certification or scoring and thus would lead us to the Case 2 offline calculator for this credit. Under the Case 2 calculator, we've created a breakdown of all space types within the mall which pointed us to use Case 2 Option 1. The baseline developed on there for the National Average Source EUI, is 315kBtu/sqft. However, the table does ask that international project insert an "Alternative Source EUI", which we assume would be the Malaysian national source EUI. But there is no such data available unfortunately. As such, we were wondering if we could opt to develop our baseline using Option 2C instead which is our historic building data + comparable buildings? Any guidance on this is much appreciated!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 08/29/2017 - 15:32

A couple of thoughts on your situation. Based on your description, I would think that the entire building would be classified as a "retail-mall" as the equivalent to Portfolio Manager's enclosed mall space type. Per the Portfolio Manager glossary, the floor area associated with the mall should include Gross Floor Area should include all space within the building(s), including retail stores, offices, food courts, restaurants, storage areas, staff break rooms, atriums, walkways, stairwells, and mechanical rooms. Given that I don't think you should break out spaces unless they are distinct from a typical mall space. With respect to the alternative source EUI, that is only relevant if your team intends to use an alternative baseline that aligns with your project location. If not, you can use the default baseline EUI. With respect to Option 2c, I think you could potentially pursue that path if you can make the case that the default EUI for a retail-mall is not an appropriate benchmark for your facility. But, I would suggest making this case to GBCI via LEED Interpretation prior to submitting the project for review.