Topic | Recent |
---|---|
IEQc8.2_Views for Exemplary Performance- DocumentationCI-2009 IEQc8.2: Daylight and views - viewsposted by Gail von Staden on Apr 8, 2011, 10:10 am
Dear Leeduser Forum :-) I'm working on a commercial interiors project that I hope can acheive the EP points. But, I'm still not sure about some of the criteria descriptions and how to... Last reply: Lauren Fakhoury, Aug 12, 2011, 9:08 am |
|
Multiple Innovation Points for Green CleaningNC-2009 IDc1: Innovation in Designposted by Jennifer Wehling on May 11, 2011, 1:01 pm
Our Team is working on a project under NC 2009. In the past we have been awarded an innovation point for a green housekeeping program. But I am wondering, using Path 1 to borrow credits from... Last reply: Erica Downs, Aug 11, 2011, 4:40 pm |
|
Eco-Healthy Child Care InitiativeNC-2009 IDc1: Innovation in Designposted by Linda Davisson on Feb 17, 2011, 9:43 am
In case anyone is designing a child care facility, our team for the FDA Child Care Center recently achieved an ID credit for committing to the Eco-Healthy Child Care Initiative. If anyone is... Last reply: Elizabeth Powers, Aug 11, 2011, 4:20 pm |
|
Entrance lobby as live-work spacePilot-Credits PC14: Walkable Streetsposted by Jens Apel on Aug 10, 2011, 7:30 am
In my project there is a main entrance lobby that includes a permanently manned reception. Would that count as live-work space for category "Ground-Level Use and Parking" option h? Last reply: Chris Marshall, Aug 11, 2011, 2:29 pm |
|
SS 1 Option 2 Path 9CI-2009 SSc1: Site Selectionposted by Augusto Velazquez on Jul 8, 2011, 7:07 pm
I am having trouble filling out the LEED Online template for option 9. The site in which our project is located has an onsite tertiary treatment plant that treats all of the wastewater generated... Last reply: Susann Geithner, Aug 11, 2011, 1:53 pm |
|
Green Roof Installation TimingNC-2009 SSc7.2: Heat island effect - roofposted by Jeremy Knoll on Aug 10, 2011, 4:07 pm
I am working on a green roof in St. Louis, MO which is due to be complete by October. We are having difficulty getting plant cuttings from local nursuries, as the planting window is so short for... Last reply: Susann Geithner, Aug 11, 2011, 1:44 pm |
|
The data I have to work withNC-2009 SSc6.1: Stormwater design - quantity controlposted by Kash Boodjeh on Jul 19, 2011, 3:47 pm
The data I have to work with for filling this credit out are pre- and post-development calculations for a 100 year storm with a duration of 1 hour. How does this relate/convert to 1-yr, 24 hr and... Last reply: Susann Geithner, Aug 11, 2011, 1:20 pm |
|
LEED Project Boundary, Existing Irrigation, and Crane PlacementNC-2009 WEc1: Water Efficient Landscapingposted by Brooks Critchfield on Aug 1, 2011, 8:30 am
We have a project on an existing campus which requires that two large cranes sit next to the project on an adjacent turf area. We do not plan to do any improvements on this turf area and plan to... Last reply: Susann Geithner, Aug 11, 2011, 1:14 pm |
|
ASHRAE Table 6.8.1 Centrifugal ChillersCS-2009 EAp2: Minimum Energy Performanceposted by Redy Truccolo on Jul 22, 2011, 4:58 am
Hi, in the table 6.8.1J of ASHRAE 90.1 there is a "condenser Flow rate" parameter, expressed in gpm/ton. Last reply: David Eldridge, Aug 11, 2011, 1:06 pm |
|
What is a "date-stamped photo"?NC-2009 SSp1: Construction Activity Pollution Preventionposted by Jean Marais on Aug 11, 2011, 10:25 am
What is a "date-stamped photo"? Last reply: David Eldridge, Aug 11, 2011, 12:56 pm |