Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

[FR] Water Closet dual flush fixtures 2-4 l ?

NC-2009 WEc3:Water Use Reduction
posted by  Nicolas MOLLE  on 

Hello, To obtain -40%, we'd like to use (in France) Water Closet dual flush fixtures 2-4 liters.

1
Fri Nov 23, 2012, 3:46 am

Toilet Scope

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  sompoche sirichote  on 

If our client who own the entire building would like to do the fitout for only 1 floor.

1
Thu Sep 13, 2012, 1:46 pm

Simulation: Baseline Chiller Part Load Performance

CS-2009 EAp2:Minimum Energy Performance
posted by  Marco Abdallah  on 

We are pursuing Option 1 (Whole Building Simulation).

1
Wed Sep 19, 2012, 6:47 pm

kitchen faucets

CS-2009 WEp1:Water Use Reduction
posted by  Alicja Bieszyńska  on 

We completed the Design Submittal when there was no tenants = no information on their fit-out space. Right now, one of our clients want to include additional tea room with kitchen sink.

1
Wed Sep 19, 2012, 1:34 am

Silicone and epoxy

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Ruba Al-Foraih  on 

Would silicone and epoxy be certified under the Bay Area Air Quality Management District (BAAQMD) regulation, or shall I consider them as paints under Green Seal?

1
Thu Sep 13, 2012, 4:27 pm

sight line angle?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Carrie Laurendine  on 

Hello, im documenting this credit for the firs time ever, and little confused over something.

1
Thu Sep 13, 2012, 2:08 pm

Does GreenPro (TM) meet LEED standard?

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Jennifer de Mooy  on 

I am trying to determine if the GreenPro (TM) certification through NMPA meets the LEED requirements.

1
Fri Sep 28, 2012, 8:12 pm

IEQ Pr1 & c2 - work code in France in place of ASHRAE

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Nicolas MOLLE  on 

Hello, IEQ-p1: Work code is more stringent than ASHRAE, so we'll use work code air rate to justify prerequisite The question is: we want to obtain the IEQ-C2 increasing by 30% the air rate BUT o

1
Fri Sep 14, 2012, 2:45 pm

percentage versus actual TSS number

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Adrienn Gelesz  on 

Hi! Does anyone know how to convert remaining g/l data into percentage data?

1
Fri Sep 14, 2012, 11:21 am

NC project schedule overlap with EBOM performance period?

EBOM-2009 SSc1:LEED Certified Design and Construction
posted by  Tiffany Moore  on 

I'm working with a project team that had planned to certify their facility under NC and follow immediately with a performance period for EBOM certification.

1
Mon Oct 22, 2012, 9:55 pm