Forum quick links
Credit Calculations
Pilot-Credits PC19:Whole Building Reuseposted by Christine Robbins-Elrod on
Hi, I'd like to verify if I have documented this Pilot Credit correctly? -I have included exterior windows in the building envelope calculations since the team is preserving all existing windows (b
LEED Project boundary and EAp2, EAc1
NC-2009 EAp2:Minimum Energy Performanceposted by Kim Sosalla-Bahr on
The project is a new facility, which has a new construction and renovation component. The new building is 6 stories tall, adjacent to an existing 3 story plus roof deck building.
Points for Provision of "Sun Pipes" Under innovation
NC-2009 IDc1:Innovation in Designposted by Yong Lee Low on
I am working on a factory project at Jakarta, Indonesia. They are using Sun Pipes to illuminate the work spaces in the office area(at level 2).
Would a Warehouse need to have Occupancy Sensors?
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Augusto Velazquez on
Our project includes an office area and a warehouse area. The office area will have occupancy sensors for each office, bathroom, corridors, etc. The warehouse will not have sensors.
Count LED conversion for EBOM MRc4?
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Molly ODONNELL on
Can MRc4 be used on EBOM project purchasing LED troffers instead of any CFLs? (Building is in the process of converting all fixtures to LED, thereby eliminating the mercury.)
Occupancy for Physical Therapy Rooms for LEED for Schools
Schools-2009 IEQc8.2:Daylight and Views—Viewsposted by Dana Murdoch on
I'm working on an early childhood education center that has a tenant that provides occupational and physical therapy to children on a one-hour appointment basis.
Window STC vs. OITC
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Dana Murdoch on
If our windows have an STC of 35 but an OITC of 25 would they qualify? I don't think so, but I don't know how to interpret or relate the OITC to STC.
Indoor Carpet Adhesives
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Colleen Ice on
Just curious I am working on IEQ 4.1 and IEQ 4.3. Both give you the option to add indoor carpet adhesives.
What to do?
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Paola Figueiredo on
Our project team is working on LEED EBOM certification of an industrial compound, and there is a question we are not so sure about and we believe one of you may be able to help.
What if there's no A/C.
NC-2009 EAp2:Minimum Energy Performanceposted by Patana Rattananavathong on
What if the project don't have any A/C? there are 3 retails, 1 wc. All are separated buildings. What should I do with ASHRAE 5.4, 6.4 and for energy simulation?