Are Form submetering requirements greater than Ref Guide?
CI-2009 EAc3:Measurement and Verificationposted by Raphael Sperry on
In Case 1 (project
Evidence Required: sample lease(s) associated with LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Jane Long on
Hi All, Could someone please enlighten me as to the relevant of the requirement to “provide the lease(s) or sample lease(s) associated with the LEED project” please? What leases?!
Denial of PC9 for non-compliance w/ technical requirements
Pilot-Credits PC9:Street Networkposted by Michael Miller on
We had registered our CI project for PC9 prior to the change to the credit that limited it to Homes projects.
EAp2 Labs21 Climate zones
posted by Allen Doyle on
It would be helpful if there were more than two options for climate zones when using Labs21 benchmark: 1) site zone 2) the nation.
Tenant owned chiller with R-11?
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Chris Munn on
I am working with a large building in New York. This building has a tenant that has their own chiller that utilizes R-11 refrigerant.
Backup Unit
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by on
I am working on a project where the main unit is new and thus in compliance but there is a backup unit which uses CFCs.
Systems Manual
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Michael Lofroos on
Although it is the requirement of the Commissioning Agent to develop the Systems Manual, Operation & Maintenance Systems manuals, can he/she delegate that responsibility to the General Contract
One Conductivity Meter for Multiple towers
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Jessica Hawley on
On our project building there is only one system meter. All cooling towers are interconnected with a single header which is monitored by the conductivity meter.
PDF Template Question
CI-2009 MRc4:Recycled Contentposted by elizabeth warlop on
Hello, I may have a question similar to above. In regards to the costs that get included in table L-3 CSI Divisions 3-10 as well as Table L-4 CSI Division 12.
Building on parking spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Tanja Arnesson on
Hi, My project will be built on a parking space that today have at least 300 parking spaces, the new project will have a parking garage that containing at most 230 parking spaces.