In Case 1 (project
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forForum discussion
CI-2009 EAc3: Measurement and Verification
In Case 1 (project
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Ante Vulin
Sustainability ManagerYR&G
80 thumbs up
October 18, 2011 - 11:44 am
Based on Table 2 in the Reference Guide I think the answers to your questions are:
- A submeter is required for process water
- If an all-electric AHU is serving only your space then a submeter is required. If the AHU serves your tenant space and another space, then a submeter is not required (if you are already paying a pro-rated portion of the bill as part of rent)
- It seems as if a submeter would be required if the electric reheat is only present in your space