Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

VOC content for thermalplastic insulation

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Dieter Ploeger  on 

Could anybody help me to orientate as to which category a thermalplastic (PE) insulation foam belongs when identifying the allowed VOC content of the adhesive?

10
Wed Dec 16, 2020, 4:18 am
1
Thu Mar 4, 2021, 10:32 pm

Future development

NC-v4 SSc3:Open space
posted by  Mike Fortier  on 

A project I'm working on has a large undeveloped area that we'd like to include in the open space calculations and the design calls for adding the necessary features to promote physical interaction

7
Tue Dec 15, 2020, 5:26 pm

Holes and vents modelling in Baseline

NC-2009 EAc1:Optimize Energy Performance
posted by  Santiago Zarate  on 

We are certifying a project located in a city in Colombia with a tropical climate with average temperatures above 23°C all year round.

0

DES rates

NC-2009 EAp2:Minimum Energy Performance
posted by  Nikos Tsitsikas  on 

Hi all,

We are working on a project that is being served by a district energy system both for heating and cooling.

1
Fri Feb 5, 2021, 6:01 pm

Boarding school

NC-v4 LTc5:Access to quality transit
posted by  Hossam Jacoup  on 

 ?Is option 2 in Access to quality transit credit can be applied for boarding school project

0

net area vs gross area (simulation)

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Takayuki Hirota  on 

Hello, I got a simple question and read most comments here and in NC, but it seems I cannot find a similar question. In my understanding, the regularly occupied areas in IEQ 8.1 and 8.2 must be co

3
Tue Dec 15, 2020, 5:19 am

Owner's Representative Sign

NC-v4 EAp3:Building-level energy metering
posted by  Sofia Barahona  on 

Does the commitment letter be signed by the owner, which appears on the Project Details registered on LEEDOnline?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Dec 14, 2020, 5:52 pm

LEED Consultants working in remote mode.

NC-v4 EQc3:Construction indoor air quality management plan
posted by  Olga Yuil  on 

As LEED Consultants we are working in remote mode because of COVID-19 risk.

The Project Team is concern about how this may or may not affect the certification.

0