Separate Heating and Cooling District Energy Systems

NC-2009 EAc3:Enhanced Commissioning
posted by  James Del Monaco  on 

Our project is located on a University campus with two separate DES buildings. One DES building houses all the chilled water equipment including chillers, pumps, cooling towers, etc.

3
Default Avatar
Sustainability Director, PE
P2S Engineering, Inc.
LEEDuser Basic Member
48 thumbs up
Wed May 9, 2012, 3:10 pm

LOv3 and Macs

Living with LEED Online - quirks, bugs and hiccups
posted by  Elliot Powers, LEED AP BD+C  on 

As a Mac user, I am beyond frustrated with how long it's taken USGBC to make LOv3 compatible with Safari 5.1 (and Lion, although that doesn't affect me so much). A few months ago, I was able to do

24
Sustainable Building Consultant
SPHERA Sustainable Building Consultants
LEEDuser Basic Member
43 thumbs up
Wed May 9, 2012, 12:54 pm

Case 2 Calculator

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Peter Keithly  on 

We had to use the Case 2 calculator because our building was too small to qualify for an Energy Star rating.

2
Default Avatar
Principal
TEAM Commissioning Associates
LEEDuser Basic Member
3 thumbs up
Wed May 9, 2012, 12:06 am
3
Default Avatar
Business Development Manager
Entegrity
LEEDuser Basic Member
154 thumbs up
Tue May 8, 2012, 11:34 pm

Cabinetry

posted by  Summer Gorder  on 
3
Default Avatar
Senior Preconstruction Manager
MaxFour
LEEDuser Basic Member
7 thumbs up
Tue May 8, 2012, 10:30 pm

Tenant's Access to BMS Room

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Maya Karkour  on 

Dear all, We're developing an M&V Plan for a large commercial mall.

3
Default Avatar
Project Engineer
Integral Group
LEEDuser Basic Member
23 thumbs up
Tue May 8, 2012, 10:13 pm

White polyethylene SRI

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Guillermo T. Adamo  on 

Hi, We are pursuing the credit by covering 50% of the parking places with a white polyethylene shade cloth of 70% density.

3
Tue May 8, 2012, 8:32 pm

Timing of IAQ testing compliance

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Anders Olson  on 

I am part of a LEED NC 2009 for Retail project that intends to pursue Option 2 -- Air Quality Testing -- for this credit.

4
Sustainability Manager
Clark Builders
LEEDuser Premium Member
8 thumbs up
Tue May 8, 2012, 8:17 pm

Flushout calcs for Option 1 Path 1

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Mark Haynie  on 

To achieve the required time needed for flush out, do we only take into consideration the OA louver volume (CFM)?

2
Default Avatar
CIH, LEED AP, CBCP
CIH Environmental Solutions
LEEDuser Basic Member
3 thumbs up
Tue May 8, 2012, 3:47 pm

EAc1 ASHRAE 90.1-2007 Energy Simulation Model

NC-2009 EAc1:Optimize Energy Performance
posted by  Denise Newbould  on 

Can someone tell me how difficult this modeling software is to use, and how long would it take an engineer who isn’t already familiar with it to get up to speed?

7
Tue May 8, 2012, 2:24 pm