Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Furniture Reuse

CI-v4.1 MRc4:Sourcing of Raw Materials
posted by  Dyllon Leather  on 

A project is renovating the 3 floors it occupies in an office building.

0

Embedded Grout Applications - VOC Requirements

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Faran Arshad Chohan  on 

If a grout product is being used within concrete/foundation works (non-finish application), where the material will be fully embedded and not exposed to occupied indoor spaces or interior air durin

3
Thu May 14, 2026, 12:25 pm

Clarification on LEED Low-Emitting Materials Applicability for Concrete Curing Compounds

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Faran Arshad Chohan  on 

We would appreciate clarification regarding the applicability of LEED v4/v4.1 Low-Emitting Materials requirements for concrete curing compounds used as part of cast-in-place concrete works.

3
Thu May 14, 2026, 12:19 pm

Are ASHRAE 62.1-2016 exhaust rates strictly mandatory for v4.1 O+M (EQp Minimum IAQ)?

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Johan Sebastian Bolivar Sora  on 

Hello LEEDuser community,

I’m working on the feasibility phase for a LEED v4.1 O+M: Existing Buildings project and ran into a gray area regarding exhaust requirements.

0

Above ground storage tanks

NC-v4 LTc3:High priority site
posted by  Samuel Calhoun  on 

A project I am working on had (QTY: 27) above ground storage tanks removed from the site. This work was overseen by a 3rd party consultant, permitted by the local AHJ, and registered with the DEP.

1
Wed May 13, 2026, 12:24 pm

Defining the LEED boundary when an ancillary building is operationally and technically independent (v4.1 BD+C)

NC-v4.1 MPR2:Must use reasonable LEED boundaries
posted by  Somebody Else  on 

Seeking input on LEED project boundary definition for a site containing two physically separate buildings: a main institutional building and an ancillary building serving a specialised operational

0

Thresholds differ in Option 1 and 2 of Water Efficiency Prerequisite

NC-v5 WEp2:Minimum Water Efficiency
posted by  Akshay Korlekar  on 

The required thresholds for Water Efficiency in option 1: Prescriptive Path are : 

0

Used AutoCASE software to achieve this credit

Pilot-Credits INpc122:Informing Design by Major Credit Category Using Triple Bottom Line Analysis
posted by  Megan Leslie  on 

I am using AutoCASE software to pursue the Informing Design Using Triple Bottom Line Analysis Pilot Credit as well as this Pilot Credit.  It is interesting to see the results of the report.&nb

17
Mon May 11, 2026, 9:29 pm

LEED v5 Pilot Credits

EBOM-v5 PRc1:Project Priorities
posted by  Srecko Curkovic  on 

Does anyone have more information on pilot credit registration requirements for LEED v5? Thank you!

0

IEQc4.1 Required information

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Victoria Rios Esteve  on 

Hi everyone! 

I´m pretty new at LEED certification process, so I will really appreciate your help. 

3
Mon May 11, 2026, 4:37 pm