Forum quick links
Exterior and Party Walls
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Shirong Meng on
The elements of "Exterior and Party Walls" include shell or not? It seems to be exterior walls seperated from outdoor and party walls seperated from other spaces.
Residentail Diswashers and Commercial Washers
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Eldis Goytisolo on
Where do I find the design flow rates for residentail diswashers and commercial washers?
Target Finder
NC-2009 EAp2:Minimum Energy Performanceposted by Guillermo T. Adamo on
We are working on a fueling station located in Buenos Aires, Argentina. The form on leed on-line requires filling up the target finder in the Energy star website.
Dust Reduction (general and from a concrete crusher)
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Sam Keehn on
Our project is located in an extremely dusty location outside of the U.S. with very light annual rainfall. The project footprint is about 30% of the overall site.
SSc3 Narrative (Pest management & ES control)
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Udana Ratnayake on
I'm not clear what i need to write as the narrative in the space given in the template. is it the outcome of the measures implemented should go in there? how comprehensive it got to be? thanks.
AGBMC v2
posted by Thomas Ehrnschwender on
I noticed that USGBC has released AGBMC v2, as of Oct 28, 2011. Is this new document in lieu of the long awaited AGBMC Part 2?
Usage per Occupancy Type
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Jean Marais on
Q1) Why is Part-Time and Full-Time occupants split?
Student Clubs to Fulfill Requirements?
Schools-2009 IDc3:The School as a Teaching Toolposted by Michael Kros on
A project we are working on is considering implementing a student club program in order to fulfill the requirements for this credit.
Modeling DOAS System efficiencies
NC-2009 EAp2:Minimum Energy Performanceposted by Brandon Frey on
I am modeling a geothermal heat pump system with a geothermal heat pump DOAS unit.
Square footage calculation
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Michael E. Edmonds-Bauer on
We have 4'' wide wall partitions between spaces. Should we include the floor surface occupied by the wall in the square footage calculation of a space?