Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Total project users as a daily average

NC-2009 PIf3:Occupant and Usage Data
posted by  Dave Hubka  on 

Project Information form #3 version 06 requires the project team to list the 'total project users as a daily average'. 

Does anyone know which credit this links to?

2
Default Avatar
Sustainable Design Director
Bell Architects
LEEDuser Premium Member
41 thumbs up
Tue Sep 19, 2017, 12:37 am

Drywall replaced on int. non-structural wall

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Marisa Britton  on 

If a non-structural wall is to have the studs remain but the drywall replaced, will that area still qualify for the MRc1.2 calculation?

0

opaque building envelope construction

NC-v4 EAp2:Minimum energy performance
posted by  Ahmed El-Semary  on 

i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??

6
Mon Sep 18, 2017, 1:25 pm

Group approach

LEED Guidance for Campuses and Multiple Buildings
posted by  Subramaniam Chandrasekaran  on 

we are looking into one campus with four buildings plus a food court; intend to register under CS; there is one virtual boundary for the whole campus; all four buildings are coming up together; sin

3
Sun Sep 17, 2017, 6:53 am

Flooring & "categories"

NC-v4 EQc2:Low emitting materials
posted by  Erin Holdenried  on 

Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did?  All flooring adhesives, coatings, sealers, grout, etc.?  In Table 5 of the refer

0

Flooring & "categories"

NC-v4 EQc2:Low emitting materials
posted by  Erin Holdenried  on 

Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did?  All flooring adhesives, coatings, sealers, grout, etc.?  In Table 5 of the refer

0

Anticipated Tenant Fit Out

CS-2009 PIf3:Occupant and Usage Data
posted by  Paula Hernandez  on 

Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo

3
Fri Sep 15, 2017, 8:56 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Fri Sep 15, 2017, 4:26 pm

Basement renovation to a LEED Platinum Building

LEED Recertification: When and How
posted by  Faith Wilbert  on 

How do you go about a renovation in a LEED Plaitnum building? Do you have to do a recertification or another process. Theay are renovating 1 floor and I'm not sure the approach I need to take

1
Mon Apr 30, 2018, 11:23 pm