Forum quick links
Main Street Program as a Priority Designation
NC-v4 LTc3:High priority siteposted by Teresa Stern on
Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.
Distance to main entrance from long term storage of bikes
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hi,
shower location in adjacent building
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hello,
LEED Project Boundary on Contract Documents
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Mark Zoeteman on
Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.
General questions about registration in LEED online
posted by Konstantina Kalliakoudi on
Hello to all,
I have following questions concerning the leed online platform.
Enhanced Cx Option 2 Envelope Commissioning Requirements
NC-v4 EAc1:Enhanced commissioningposted by Krystina Kattermann on
Hi folks,
Notes from the First SCL Summit
posted by Nadav Malin on
I really appreciated our day on Tuesday--seems that we had a great inaugural Summit, and covered a lot of important ground.
Question about final review
posted by Konstantina Kalliakoudi on
Hello to all,
I have following question concerning the process of preliminary and final review.
LCA Boundary Condition
NC-v4 MRc1:Building life-cycle impact reductionposted by Thanyatorn Khumpairoj on
I have questions about the whole building life cycle assessment (LCA). Why baseline is so open? According to ASHRAE 90.1, Do we use only for U-value of the envelope?
Baseline System 3 for Electricity and Natural Gas
Retail-CI-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
For a retail store less than 1,000 m2 spread in 2 floors with FCUs using electricity for cooling and natural gas for heating could you confirm that Baseline system 3 is applicable for this case?