humidity sensors "for" occupied spaces or "in" occupied spaces
EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoringposted by Jean Marais on
The credit language says "in", but could it mean "for".
Too many measurements!
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Eric Shamp on
I'm working on a skylit warehouse, around 700k sf.
Control on a Store
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Sustentator Argentina on
I'm trying to certify a store under CI, not CI Retail. How would I control the temperature of more than 50% of the space, if the space is my practically my entire shop?
Mechanical Ventilation in some areas of building
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Hello, I have the following doubt: Suppose that a building has an HVAC system designed for all office and working areas, but for the restrooms and locker rooms, which are occupied every shift (3 p
Meeting rooms requirements
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Brian Farrelly on
An office we are currently working on, is in a long narrow building resulting in 85% of the occupants being close to an operable window, however we have two meeting rooms.
Residential Bath Lavs
NC-2009 WEc3:Water Use Reductionposted by Jeremy Kuhre on
Does anyone have experience with using a 1 gpm aerator in a residential setting? We typically use 0.5 gpm aerators in commercial settings which has worked fine.
Avoidance of Chemicals of Concern Credit
posted by Anne Less on
Yikes! I spy what I hope is a MAJOR typo in this credit language.
Prerequisites in Master Site
posted by Omer Moltay on
We are using the campus approach for a mixed used development. None of the prerequisites will be applied under the master site.
Health Faucet
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Green BSL on
Hellow, Shall we consider Health Faucet provided in restroom for LEED CI Calculation in WEp1.0 & WEc1.0?
Building Envelope Compliance
CI-2009 EAp2:Minimum Energy Performanceposted by Omar Delgado on
Greetings, We're doing a CI project where the glazing far surpasses the 40% wall area allowed on the north wall. However, the envelope will not be altered for this project.