Forum quick links
Cork Bulletin Boards and Marker Boards
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Abena Darden on
Does anyone know if cork bulletin boards or marker boards typically have urea formaldehyde resins?
Achieving IEQc1 with no ventilation as part of C&S project
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Tony Schafer on
Can this credit be achieved if there will be no ventilation as part of the C&S project?
Relocating Furniture
CI-2009 MRc5:Regional Materialsposted by Sheela I on
Hello, I am working on a LEED CI project and we are reusing most of the furniture at the new office location. The distance between new and the previous office is with in 500 miles.
Negative Pressure Differential Requirement
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on
Dear all, One of the credit requirements is that: "The pressure differential with the surrounding spaces must be at least 5 Pa on average and 1 Pa at a minimum when the doors to the rooms are clos
Does a crisis center require covered storage for bikes?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Megan Dougherty on
Our project is a crisis center which provides drop-in services and short term residential services. The drop in portion is considered an institutional project.
Site disturbance from a project surrounded on all four sides
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Achelles DSouza on
I am working on a project which is surrounded by existing facilities on three sides, and road on the fourth side.
Views and window coverings
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Nancy Goshow on
Can you still achieve the views credit if you have a commercial interiors space meeting all of the requirements of the credit except that due to security purposes the horizontal blinds need to be
Underground Parking and IEQ 4
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Ibrahim El-Shair on
What are possible conditions to enable excluding underground parking from calculations of IEQ 4 - Low emmiting materials? if we have 3 underground levels of parking and they have the following con
Paint on the inside of pipes
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Emmanuel Pauwels on
Our project has a district heating and cooling system. The inside of the pipes that connect the building with the district heating and cooling system have a paint.