Forum quick links
Default Budget %
CI-2009 MRc5:Regional Materialsposted by Nate Maniktala on
What is the 'Default Budget Percent'? In NC, it is as stated as 45% but CI does not mention this percentage specifically.
Are glulam beams included in credit EQ4.4
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Joanne Sawatzky on
We are wondering if glulam beams need to contain no added urea formaldehyde? thanks curtis
LEED-CS v2.0
NC-2009 PIf1:Minimum Program Requirementsposted by Jodie Clarke on
I have a project that registered using LEED-CS v2.0 in 2007.
Green Vehicles for Warehouse and distribution centers
posted by Rob Watson on
For warehouse and distribution centers, SSc8 an Option 3 should be introduced such that if a firm has an established logistics optimization system in place that will be implemented at a new facilit
What will the fixes be for LEED Online V4?
posted by Rob Watson on
In order for successful ballot, I believe that it will be imperative for USGBC and GBCI to let users know in a fair amount of detail how they're planning to address the existing shortcomings in the
The What vs. The How
posted by Rob Watson on
I believe that "The What" (credit requirements) is less important to the success of Version 4 in the market compared to “The How." By “the How,” I mean the submittal requirements and the tools f
Suggestion for an alternative transition between V3 & V4
posted by Rob Watson on
What I think would be better for the transition would be to allow an alternative compliance pathway for the materials credits ("Backwards compatibility"-a bit more on this in a separate post) and h
leed online v3 user interface
posted by sam Alfassy on
i can not make the leed online interface show normalyy - all text is alligned to the right side of the screen. I am working with a left to right interface (for hebrew language) i have downgraded my
submit to leed-online compliance
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I
NC Innovation credits from EBOM, design or construction review?
posted by SmithGroup BG+LU FW on
If an ID credit is first submitted during preliminary review for design credits and the reviewer's comments require client input that will take longer than 25 (working) days for us to document can