Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED v5 - Feedback

LEED v5 BD+C/ID+C: Materials and Resources Public Comments
posted by  Veronika Elfmarkova  on 

Dear all, 

I have attended the webinar and please see comment below: 

0

Strategy 10: Additional Source Control and Monitoring

NC-v4.1 EQc1:Enhanced Indoor Air Quality Strategies
posted by  Adrienne Franz  on 

We got our LEED comments back and one of our comments was "The narrative on the LEED form outlines that source contaminants may enter the building because they are stored elsewhere on site.

1
Fri May 31, 2024, 5:15 am

Mechanical Loads

NC-v4.1 EAc3:Advanced Energy Metering
posted by  clinton cantrell  on 

We are having a debate on the criteria.

1
Thu May 30, 2024, 9:01 pm

Pilot Credit EApc106 ISO 50002 Energy Audit

EBOM-v4 INc1:Innovation
posted by  David Alemany  on 

If this pilot credit was part of a pre-requisite or credit perhaps the advantages and disadvantages could be explained of using ISO 50002 or ASHRAE Procedures to carry out energy audits for th

0

Pilot Credit – Local Food Production

EBOM-v4 INc1:Innovation
posted by  Amanda Tullos  on 

We are trying to pursue Pilot Credit – Local Food Production, but we are not sure how the Site-specific IPM record log, including a narrative describing universal advance notification of

1
Mon Jun 17, 2024, 3:28 pm

Innovation: WELL Features

NC-v4 INc1:Innovation
posted by  Laura Heagler  on 

This innovation credit awards a point for complying with WELL Feature 87: Beauty and Design.

3
Thu May 30, 2024, 4:06 pm

Density Calculation

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Ahmed Abdul Rahman  on 

Hello All,

I am new to LEED certification and will be going through my first certification process soon.

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Thu May 30, 2024, 2:04 pm
11
Thu May 30, 2024, 7:37 am

Pilot Credit: Prevention Through Design Comment

Pilot-Credits IPpc93:Prevention through Design
posted by  Afogreen Build  on 

To comply with this credit, the project team should fill out the Prevention Through Design worksheet (PtD) for Life Cycle Safety and Health, which is divided into two stages: Operation & Mainte

0

Group Approach?

LEED Rating System Selection
posted by  Santiago Avila  on 

 

Hello everyone,

6
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Thu May 30, 2024, 3:51 am