Forum quick links
Offsite Renewable Energy
NC-2009 EAc1:Optimize Energy Performanceposted by Dave Hubka on
Our project will have a biofuel system that utilizes agricultural crops as the biofuel. Per the LEED reference guide this is considered to be renewable energy.
3 phase project - when do I need to procure Green Power?
NC-2009 EAc6:Green powerposted by Ted Vanderlinden on
We've evaluated energy consumption during design phase and are working with the owner to determine who we will be purchase credits from. Question is really timing.
airflow control in a reference building
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
In our proposed building we have CAV ventilation system which at night (when there's noone in the building) will provide 50% of the designe airflow rates.
Can I register a Mock or Dummy Project for training purposes?
posted by John Smith on
I wish to pay the fee and register with LEEDonline (v3) a project about a real building that is to be designed and constructed, but the owner is not interested in obtaining any LEED certification.
Occupant Survey Form
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Aurélie Kazour on
Hello. I am preparing to conduct the occupant comfort survey in a hospital. I am not sure if the below form is valid: /// Survey form based on: LEED for Existing Buildings: Operations & Mainte
DOAS units
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Mike oliva on
I need some clarification on what definition of a "ventilation system" would be with respect to design that uses a DOAS unit that provides outdoor air to each space.
Interior renovation
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Erin Holdenried on
We are working on an interior rennovation of a multi-level office building with one owner/tenant. We are not touching the core, shell or landscape.
Do Requirements Apply?
Retail-NC-v2009 IEQc4:Low-emitting materialsposted by Carly Ruggieri on
I'm trying to determine if certain materials will apply for the purposes of the EQc4.6 credit for low-emitting ceiling and wall systems.
Termic coating - where to fit?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Marcio Alberto Casado Pereira on
We have a product that will be used on the metal piping of a power generator. The piping will become hot during use, therefore the coating needs to be resistant to the heat.
LEED CI EAp2 - ASHRAE 90.1 building envelope compliance
CI-2009 EAp2:Minimum Energy Performanceposted by Michele Helou on
Can anyone tell me if the addition of interior storm windows without a change in existing fixed windows would trigger having to meet either the prescriptive requirements or the ECB ch.