VAV Fan control for baseline system 6
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have a rough time seeking to reduce supply fan energy during energy simulations.
Submeters to measure AND RECORD energy use
CI-2009 EAc3:Measurement and Verificationposted by Michael Smithing on
In our project the tenant pays a lump sum for thermal energy use, but pays for electricity based on actual consumption. We therefore cannot achieve the 3 points.
MRc2 Form Version 0.2.3.. undervaluing commingled waste?
NC-2009 MRc2:Construction Waste Managementposted by Jake Bebee, LEED AP BD+C, ID+C, WELL AP on
I've been reviewing credits for project teams for a while now and cannot figure this out to save my life. One of my team members has mistakenly entered a bunch (about 88% by tonnage) of commingled
Strip out plan
CI-2009 MRc2:Construction Waste Managementposted by Graham Langton on
We are tendering out project in 2 phases. 1 contractor will be brought on to provide a strip out (typical demolition services of a CI project).
UV Lacquer
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Susan Coy on
Is there any restrictions on using UV Lacquers?
selecting the correct rating system in v.2009
posted by KIMBERLY KRAFT on
Hello LEEDuser community- I need your opinion on the correct v2009 rating system to use for an office project. Here are the stats: -The 6,000 square foot space is in an existing building that has b
Groundwater to achieve this credit
CS-2009 WEc2:Innovative Wastewater Technologiesposted by MKK LEED on
Hi, I wonder if using groundwater pumped away from the building’s basement or foundation to use in flush-toilets and urinals instead of potable water is a way to achieve Water Efficiency Credit 2,
C&S Building with no HVAC upon initial completion
CS-2009 EAp2:Minimum Energy Performanceposted by Tony Schafer on
This question is related to both EAp2 and EAc5.1.
Thresholds, Prerequisites, Lease Language, 10102
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Katie Peterschmidt on
I am working on a mixed-use building that is required by municipal code to achieve LEED Silver.