Fume hood exhaust fan process load?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I think fume hood exhaust are unregulated in 90.1 2007 thus should be process load. But just want to confirm. I do see EPAct 2005 says fume hood should not be treated as process load...

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Mon Jul 6, 2015, 4:07 pm

Basline system for 5 floors + small below grade conditioned spac

NC-2009 EAp2:Minimum Energy Performance
posted by  Zonda E. Team  on 

What is in your opinion the baseline for the following building: Floor area:12,000 sqm (130,000 sqft) Floors: 5 above grade, mostly conditioned.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Jul 4, 2015, 7:31 pm

Pre-development Conditions

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Leandro Silva  on 

Greetings Our project is a 30 year old building undergoing a Major Renovation and will be registered as LEED-NC v2009. In calculating pre- and post-development runoff, do we consider the pre-develo

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Jul 3, 2015, 6:26 pm
6
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Jul 3, 2015, 6:18 pm

SS 4.4 No New Parking.

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Rezkar Abdulmajeed  on 

I have the first LEED project in a campus. The project will be built on an existing parking lot and no new parking will be added within the LEED project boundary.

5
Fri Jul 3, 2015, 2:16 pm

Fuel Stations for Shared Parking Lot Outside of LEED Boundary

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Mary Kay  on 

Our project has no new parking. We are on a campus where there is an existing parking lot adjacent to our building, but not within our LEED project boundary.

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Fri Jul 3, 2015, 1:39 pm

Additional lighting power density in a retail store

CS-2009 EAp2:Minimum Energy Performance
posted by  Felipe Duran  on 

Dear All, We are working on a shopping mall project which is pursuing LEED for C&S certification.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jul 2, 2015, 9:05 pm

Shared building electricity meter

EBOM-v4 EAp2:Minimum energy performance
posted by  LEED Pro Consultant  on 

We have a building which shares electricity meter with an adjacent building, only one building will be intended for certification, it is possible to identify the percentage of consumption in every

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu Jul 2, 2015, 8:39 pm

small DES

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

For a preliminary review I modeled a building that is heated and cooled by four geothermal heat pumps that are located in a technical room within the building.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jul 2, 2015, 2:57 pm

Pilot Credit Closed

Pilot-Credits EApc8:Demand response
posted by  Haley Duncan  on 

Hi, It looks like USGBC has closed this pilot credit to NC 2009 projects.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Jul 2, 2015, 1:40 pm