Forum quick links
KCMA -Reston, VA
NC-2009 MRc7:Certified Woodposted by Lilian Seow on
Does anyone have any comments on this KCMA ? Are they considered as USGBC approved equivalent for LEED V4? http://www.kcma.org/ http://greencabinetsource.org/
Street frontage and an urban setting
Pilot-Credits PC14:Walkable Streetsposted by Renee Shirey on
Has anybody had success with this credit on a project in an urban setting? What about approaching it with an 'Alternative Compliance" path?
Existing Central Plant and New building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
We have a new building that is served by the existing central plant.
Calculations
NC-v4 SSc4:Rainwater managementposted by Gustavo De las Heras Izquierdo on
Hallo, I have documented SSc6.1 and SSc6.2 for almost 15 projects with a 100% success rate.
LEED Baundary Campus - parking lot
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by gabriel Morales on
We have a campus project consists of 2 towers with retail corporate considered LEED CS and 2 residential towers that are not LEED certified , is underground parking on 5 levels with a design criter
Appeal Design Credits After Construction Review has begun?
posted by Garrett Ferguson on
I have a CS 2009 project where 2 credits were denied in the Design Final Review. We are sitting at 42 points if all goes as planned.
IDF curves
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by MKK LEED on
Hi, I have a NC project in Colombia and the Environmental Authority just have IDF curves since 3 years. I don't have information since 1 and 2 years.
no cooling / using addendums
CS-2009 EAp2:Minimum Energy Performanceposted by Samuel Sura on
Hello, I have two questions: 1) we are working on residential building where its occupied spaces has heating and cooling, but rooms situated on north facade has no cooling system.
LEED v3 CS: IEQ8.1 and 8.2 - How to Calculate Zone Floor Area
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Maggie Hogan Skaug on
This project is a high rise mixed-use office building pursuing LEED Core & Shell certification with no or limited tenant build-out plans.
TAB Report and Calculations
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Tom Liebel on
We have just received a request for additional clarification during our final review of our LEED-EBOM 2009 submission, asking us to confirm the date of our TAB report, and pointing us to the the Ca