Forum quick links
24-hour lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Bill Swanson on
I looked thru all 2000+ comments and didn't see this addressed. I have a hotel project with a pool, fitness room, vending/ice machines, ect.
Loading Dock
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by David Wood on
I had a question in regards to loading dock.
LPB for underground parking area shared between several projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kent Liu on
I am currently defining LPB for 3 different LEED projects under the same developer.
Multiple buildings, common basement
posted by Katherine Mariano on
Hi, We have a BPO project that wants to be certified but the case is that it shares a common basement with a retail and a hotel.
Qualification for LEED CS vs. NC
ND-v2009 PIf1:Development Program and Site Typeposted by Jin Yang on
Hi Eliot, The master planning project consists of two parcels with three highrise buildings.
Project Type and Rating Type for Block Project
posted by Jin Yang on
I working on a master planning development consists of two parcels with three highrise buildings intended for highend administrative offices.
is this clarification ok?
NC-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
automatic daylighting controls and occupancy sensor are adapted into the project, and many other energy saving measures included,i do not simulate daylighting control and occupancy sensor in the en
Natural landscape to recover on site
NC-2009 WEc1:Water Efficient Landscapingposted by Luis Huertas on
Our project is going to allow the natural landscape to return to the landscape areas of the project. Can I claim no potable use and achieve the credit using this strategy?
Entering Transporation Management Plan on LEED Online
posted by Rosemary Mascali on
My client is pursuing an exemplary point for a Transportation Management Plan for a V2009 NC application.
Section 11 or Appendix G?
CI-2009 EAp2:Minimum Energy Performanceposted by Steve Gross on
Does this credit require the use of Section 11, or can Appendix G be used? I previously asked this about EAc1.3, but this credit does state section 11 in the language.