Calculate Button on Form

CS-2009 WEp1:Water Use Reduction
posted by  John Riker  on 

Our MEP has filled in all the information required for WEp1 form, but pressing calculate (on MS Internet Explorer) does not generate any results.

1
Sat Jul 26, 2014, 5:29 am

Commercial Office - Rating System selection

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Rohit Jagnani  on 

I have a client looking for LEED certification of its Commercial offices.

1
Tue Jan 7, 2014, 3:46 pm

Ground source water loop required District Cooling guidance?

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

We would like to ask something regarding a comment from a reviewer for EAc1, this is a rather vague comment in our view.

1
Tue Jan 7, 2014, 9:14 pm

EA c1.2 form Space types

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Michael Archer  on 

I was wondering why the EA c1.2 form doesn't include an option for Private Office under the Space Types column? Are we to assume all office type spaces are to be categorized as Shared Office?

1
Tue Jan 17, 2017, 2:34 pm

Calculation

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Fabien Challeat  on 

Hi, Our project has several buildings going for LEED certification. We are using 2 different roofing materials with SRI of 106 and 84 for low slope roofs. Total roof area for all 7 buildings is 9

1
Tue Dec 23, 2014, 5:03 pm

Underground floors...

NC-2009 PIf2:Project Summary Details
posted by  Marcin Gawronski  on 

We are currently assessing office building which has 2 underground floors. On level -2 there are only: parking, storage, mechanical rooms etc.

1
Sun Jan 12, 2014, 11:56 pm

Hello, regarding my previous

NC-2009 EAc2:On-Site Renewable Energy
posted by  Gabriele Polenta  on 

Hello, regarding my previous post I have one more doubt: having the building with a biomass system, in EAc1 when calculating the thermal energy do I have to use the local gas cost or the local biom

1
Wed Jan 8, 2014, 4:48 pm

biking line

Pilot-Credits PC14:Walkable Streets
posted by  Lily Li  on 

The building is parallel to the street, cross street it's a biking line, can this still count towards the credit, please advise.

0

Undeveloped vs. Greenfield

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Michelle Rosenberger  on 

One of our warehouse projects is the fifth phase of an existing development.

1
Tue Jan 28, 2014, 6:07 pm

CO2 sensors in duct work

Schools-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Todd Bundren  on 

The mechanical engineer who designed our heating / cooling system placed the CO2 sensors for the gymnasium (with bleachers) in the return ducts.

1
Wed Jan 8, 2014, 10:08 pm