combine rail and bus for exemplary performance

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Courtney Royal  on 

hi, i was wondering if its possible to use a combination of subway and bus lines to achieve an ID EP credit. I think we've done that in the past, but I can't remember! Thanks!

1
Mon Dec 3, 2012, 8:51 pm

Wind Energy

CS-2009 EAc6:Green Power
posted by  LEED Pro Consultant  on 

Hi, We are working on a project in Mexico. In order to comply with the credit requirments its valid to purchase electricity directly from a wind farm also in Mexico to get the points?

1
Fri Nov 30, 2012, 2:26 am

Served by part of large air-conditioning system

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Shirong Meng  on 

If the project spaces are served by a large VAV system which has mixing of central Outside air inlet and recirculation air, but the VAV system is also serving other tenant spaces.

1
Mon Jan 21, 2013, 8:13 pm

90.1 Envelope Requirements

NC-2009 EAp2:Minimum Energy Performance
posted by  Ruben Porter  on 

I'm trying to model a wood framed 4 story multifamily building, and the client wants to go without continuous insulation which is what's called for on table 5.5-4, resulting in a higher U value th

1
Fri Nov 30, 2012, 4:51 pm

Appeal submitting period

General forums
posted by  eirini matsouki  on 

hi there, one of our porjects is been denied a pre-requisite (EAp2) during the final design review and hence the project has entered the appeal process (enetring the 'design appeal review' - within

1
Wed Dec 5, 2012, 9:09 pm

Covered Loading Dock - What is a parking space?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Richard Woodward  on 

We are working on an urban alteration project which extends an existing building to cover an exterior loading dock, enclosing it within the new building.

1
Thu Dec 13, 2012, 9:41 pm

SSC1 Path 5: Heat Island Effect: Roof

CI-2009 SSc1:Site Selection
posted by  Elliot Young  on 

I am working on a project with an existing ballasted roof & am wondering if we could get this credit.

1
Fri Nov 30, 2012, 9:58 pm

Base case system for high equipment loads spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Nandana Kumar  on 

The project is a 67000 sqft, six floored building. There are rooms with high equipment loads of greater than 20W/sft . The total area of these type of rooms adds up to 14,000 sqft.

1
Tue Dec 4, 2012, 2:42 pm

Water waste

NC-2009 MRc2:Construction Waste Management
posted by  Karim Farah  on 

During coentsruction, a project has a major amount of water waste (more than 50% of the total amount of the waste generated by one production unit), this quantity of water is a result of the produc

1
Mon Dec 10, 2012, 6:07 pm

Tap for bar counter

Retail-CI-v2009 WEp1:Water use reduction
posted by  Eddy Tsang  on 

Should i include the tap for the bar counter in the water use reduction calculation?