Forum quick links
Core and Shell Definition
CS-2009 EAc1:Optimize Energy Performanceposted by Tom Nichols on
Can a building without a core HVAC systems be certified under LEED CS? For example, a two story building with a 6,500 ft2 footprint per floor.
LEED for Healthcare in Second Public Comment Period
posted by Mike Barker on
Any idea how many hospitals were rated using LEED 2009 and the older versions ?
SSc7.2 Inquiry - Subterranean 'Roof'
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Patrick MacPherson on
Hello, The project I am working on consists of a tower with subterranean spaces that lie beyond the tower's footprint.
Phase II
Schools-2009 SSp2:Environmental Site Assessmentposted by Terry Squyres on
If your project finds contamination on site during construction, does remediation have to be complete before the LEED design application can be submitted?
Excluding Casework from IEQc8.1 & IEQc8.2
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by John Drigot on
On a previous LEED for Schools 2009 project I was sucessful in not including the space occupied by built-in casework in the occupied square footage of a space.
Certification Requirement
posted by Peter Doo on
The Reference Guide states that the final step to certification occurs when "certificates of occupancy for buildings...have been issued..." Does this mean that 100% of the buildings must be constru
LEED Boundary and equipment
CS-2009 EAp2:Minimum Energy Performanceposted by Gabriela Hernández Castillo on
We have a mixed use project with several buildings on it, from which one of them will apply for LEED-CS certification.
Occupancy Sensors
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Lindsay Duncan on
In the past GBCI has stated as a side note: "For future projects, please note that occupancy sensors alone are not an acceptable form of lighting control".