hii, we are doing LEED-CI project, and we have installed submeters like BTU meter, kwh meters and also implementing EA Credit 30. Measurement and Verification. Also above of this we have BMS system to control all of this, but i am not sure how should I document this credit and what submittals required. Can any one help me out???

4

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 06/29/2011 - 15:55

Monu, for this credit, we have a survey type form to complete and a few uploads to provide for the reviewer. Here are the submittal requirements: Complete the Google Form (https://spreadsheets.google.com/viewform?hl=en&formkey=dGVCVGRBWl9XNWVJVjRlRkswTFYzSHc6MQ#gid=0)as submittal for this credit. AND For All Options: Upload. Provide a copy of the data collection system specifications used in the project. Upload. Provide a summary of the energy use management system used in the project. Option 1: Upload. Provide the calculations used to determine cost-effectiveness for the incremental cost of the entire system and individual end-uses.

Thu, 06/30/2011 - 07:32

Thank you for your reply, but can you let me know If I am going with option 1 Prescriptive approach, how can I calculate cost effectiveness for incremental cost for the entire system and individual uses??