Trees sf calculation for Protect or Restore Habitat v4.1
NC-v4.1 SSc2:Protect or Restore Habitatposted by Maya Facciolo on
How do we calculate the square footage for contiguous trees for Protect or Restore Habitat v4.1?
Furniture Reuse
CI-v4.1 MRc4:Sourcing of Raw Materialsposted by Dyllon Leather on
A project is renovating the 3 floors it occupies in an office building.
Embedded Grout Applications - VOC Requirements
NC-v4.1 EQc2:Low-Emitting Materialsposted by Faran Arshad Chohan on
If a grout product is being used within concrete/foundation works (non-finish application), where the material will be fully embedded and not exposed to occupied indoor spaces or interior air durin
Clarification on LEED Low-Emitting Materials Applicability for Concrete Curing Compounds
NC-v4.1 EQc2:Low-Emitting Materialsposted by Faran Arshad Chohan on
We would appreciate clarification regarding the applicability of LEED v4/v4.1 Low-Emitting Materials requirements for concrete curing compounds used as part of cast-in-place concrete works.
Are ASHRAE 62.1-2016 exhaust rates strictly mandatory for v4.1 O+M (EQp Minimum IAQ)?
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Johan Sebastian Bolivar Sora on
Hello LEEDuser community,
I’m working on the feasibility phase for a LEED v4.1 O+M: Existing Buildings project and ran into a gray area regarding exhaust requirements.
Above ground storage tanks
NC-v4 LTc3:High priority siteposted by Samuel Calhoun on
A project I am working on had (QTY: 27) above ground storage tanks removed from the site. This work was overseen by a 3rd party consultant, permitted by the local AHJ, and registered with the DEP.
Defining the LEED boundary when an ancillary building is operationally and technically independent (v4.1 BD+C)
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Somebody Else on
Seeking input on LEED project boundary definition for a site containing two physically separate buildings: a main institutional building and an ancillary building serving a specialised operational
Thresholds differ in Option 1 and 2 of Water Efficiency Prerequisite
NC-v5 WEp2:Minimum Water Efficiencyposted by Akshay Korlekar on
The required thresholds for Water Efficiency in option 1: Prescriptive Path are :
Used AutoCASE software to achieve this credit
Pilot-Credits INpc122:Informing Design by Major Credit Category Using Triple Bottom Line Analysisposted by Megan Leslie on
I am using AutoCASE software to pursue the Informing Design Using Triple Bottom Line Analysis Pilot Credit as well as this Pilot Credit. It is interesting to see the results of the report.&nb
LEED v5 Pilot Credits
EBOM-v5 PRc1:Project Prioritiesposted by Srecko Curkovic on
Does anyone have more information on pilot credit registration requirements for LEED v5? Thank you!