Forum quick links
Definition of Facade Lighting
NC-v4 SSc6:Light pollution reductionposted by Yoyo Shek on
We are having a zero lot line project, the only exterior lighting will be on the facade, roof and terrace.
SRI Values for Precast Concrete?
NC-v4 SSc5:Heat island reductionposted by Brian Salazar on
Hello - Has anyone found a published study or list of SRI values for precast concrete when used as a roof material, specifically as the top level of a parking structure?
PPE in waste management.
NC-v4 MRc5:Construction and demolition waste managementposted by Olga Yuil on
Can personal protective equipment (PPE) - such as helmets, safety glasses, construction uniforms, boots, and gloves - be counted as an item under the waste management credit?
Autocase inputs slightly different than LEED Outputs
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Jill Kurtz on
We use the Autocase tool for this innovation credit and find some of the inputs they require are slightly different than how LEED outputs information.
EQp1 Minimum Indoor Air Quality Performance Mechanical ventilation using the Alpac system
NC-v4.1 EQp1:Minimum Indoor Air Quality Performanceposted by Matteo Mangiolino on
We are evaluating the feasibility of implementing, within a residential building, a window‑integrated mechanical ventilation unit featuring a variable outdoor airflow capacity ranging from 15 m³/h
Circular Products -Pilot Credit Attempt
Pilot-Credits MRpc131:Circular Productsposted by Patty Lloyd on
Hello, I am attempting this pilot credit and am finding a couple of the pathways to be difficult to achieve.
No outdoor lighting?
NC-v4 SSc6:Light pollution reductionposted by Deborah Lucking on
We have a project that has no exterior lighting - not even emergency egress, as the travel paths go through an existing, compliant building.
UGR>19 In Cleanrooms
posted by James G on
We have recently come across a scenario where LEED compliance is required in a cleanroom.
Construction Waste Management - use of materials for shoring, etc.
NC-v4.1 MRp2:Construction and Demolition Waste Managementposted by Erik Heuler on
If a contractor uses demolished lumber as temporary shoring on a project does that count as material reuse or diversion from the landfill?
Surrounding Density - Future Development
NC-v4 LTc4:Surrounding density and diverse usesposted by Laura Smith on
We are working on a project that does not yet meet the density requirement but is expected to see substantial development in the near future.