Forum quick links
Outdoor air delivery monitoring
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Rodrigo Vazquez on
If the project is a core & shell design and the distribution of the area is not know (tenants space) yet, is it correct to specify only a CO2 sensor on the return duct of the AHU?
SRI Testing Labs, Do They Need to be Certified in some way?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin D. on
For users who are not using a roofing material with a known SRI, or for manufacturers who want to add SRI data to their product data sheets, does the lab they send their samples to need to be certi
LEED NC for two buildings from 15
posted by Somsak Jidmon on
Hi, If the project comprise of 15 buildings in one site and the owner would like only two buildings to be LEED certified.
NYC project
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Megan Bove on
Hi. I have a project in the city where subway grates are found right outside the project fence as well as always a storm drain that is on a very busy street.
Contained Contaminated Soils & non-ASTM E1527-05 Phase II
NC-2009 SSc3:Brownfield Redevelopmentposted by Dana Murdoch on
We have a site with contaminated soils. A Phase II was conducted, but not per ASTM E1527-05 as required.
One story condominium comlplex - tenant specification for LEED
posted by Tom Kennedy on
Hello, Myself and 3 others in the Cincinnati Regional Chapter did an intro to V4 event for chapter members tonight and fielded questions at the end. A gentleman said he wants to generate a tenant d
EA Cr5: Measurement & Verification for projects wherein Option D
NC-2009 EAc5:Measurement and Verificationposted by Sasha Peters on
The query is with reference to achieving EA Cr5: Measurement & Verification for projects wherein Option D and Option B of IPMVP Vol.III is not possible. In lieu of same, please confirm if in
Does Seeding Apply
NC-2009 WEc1:Water Efficient Landscapingposted by Terry King on
Does seeding (hydroseeding) apply toward the needed 5% landscaped area? Thanks
LEED Boaundary and Utility Connections
Schools-2009 PIf4:Schedule and Overview Documentsposted by Larry Turbes on
We're certifying a school addition and the site area associated is fairly straight forward except we have both power and sanitary utility connections that finger out beyond what would be a reasonab
posted signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by yukari kubo on
we are building a campus of buildings (non-school) that has a non smoking policy except in one designated outside area.