Forum quick links
Additonal Interior Lighting Power
Retail-CI-v4 EAc2:Optimize energy performanceposted by James Pack on
We are trying to calcuate the additional allowance for Display Lighting in a Jewellery store.
Additional Interior Lighting Power
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi all, I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell).
Air Test Sampling Point Location
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Noriko Nagazumi on
Hello,
The reference guide states that the testing must include all occupied spaces. Occupied spaces refer to both regularly and non-regularly occupied spaces.
Entryway system for little occupied areas without access to the rest of the building
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Paola Moschini on
Dear all,
2 Questions on Documentation
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Stephan Zweig on
Dear Leed Users,
I have following questions concerning the documentation of this credit
Hiring - LEED Project Administrator
posted by Trisha Highnote on
Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR.
Using Existing LEED certified Parking for EV Charger Installation in New Project
NC-v4 LTc8:Green vehiclesposted by sompoche sirichote on
We have a two-phase project: Phase 1 and Phase 2.
Technical Reference Request: Definition and Use Cases for Greenhouse Gas (GHG) Emissions Metrics
posted by Victor Braciszewski on
Hello Community!
Alternative measurement to material costs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Ingrid Pohl on
I'm working on a project where we cannot gather the information of the specific material costs. Is it possible to calculate the percentage based on the weight or the volume instead of by cost?