Forum quick links
An awesome bicycle tour in store for the Winter Summit!
posted by Nadav Malin on
We just had a planning call for the tour, and I’m more convinced than before that: a) we picked a great location for this year’s Winter Summit and b) you won’t want to miss this tour!
Core & Shell or Healthcare situation
posted by KATHERINE AGUILAR on
If a building will be constructed to be leased for hospital purposes to an unknown medical operator, it is possible tu apply for a Core & Shell certification instead of Healthcare?
ID for smog sensors and anti-smog masks
NC-2009 IDc1:Innovation in Designposted by Natalia Kwiecinska on
Our project is a hotel located in the city with huge problem with air pollution-smog. During 76 days in the year, the concentration of PM10 in the air is over the permitted limit.
C&S Occupancy
CS-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Hi,
We are working on a C&S project. We know that the spaces on the Ground Floor will be Restaurants and Sales spaces.
LEED ND GIB Credit for District Heating and Cooling
posted by nathan jame on
Hi, refers to the ND GIB for district heating and cooling, it says "Each system component that is addressed by ANSI/ASHRAE/IESNA Standard 90.1–2010 must have an overall efficiency performance at le
Commissioning in a non-LEED building
CI-v4 EAp1:Fundamental commissioning and verificationposted by Deborah Lucking on
We researching the viability of pursuing LEED certification for interior renovation work in an older, existing building that is not LEED certified. The existing plant is to remain,
LEED v4 CI Retail - Occupancy counts across prerequisites
Retail-CI-v4 EQp1:Minimum indoor air quality performanceposted by Cindy Davis on
My retail project is a grocery store that 24,955 SF. It operates for a 17-hour day.
Historic District vs Historic Building
NC-v4 MRc1:Building life-cycle impact reductionposted by Cynthia Kaplan on
Has anyone had success obtaining this credit with a building within an historic district?
Should I include the club space in daylight simulation?
NC-v4 EQc7:Daylightposted by Agnieszka Kaczmarek on
On level -1 the club space is projected.
Performance period length- Recertifying under a newer version
posted by Anna Kaelin on
Our project achieved LEED-EBOM v2009 certification in 2013. We are now attempting LEED-EBOM recertification under LEED v4.