Forum discussion

NC-v4 EAp2:Minimum energy performance

Selection of HVAC system for baseline building

Hi,

for baseline building HVAC selection, we shall follow table G3.1.1A (ASHRAE 90.1-2010), being the system defined depending on the building number of floors and its conditioned area.

Refrigerated areas shall be considered conditioned areas for the purpose of baseline HVAC selection?

Regards,

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 01/30/2019 - 16:45

Technically it is a conditioned space but the conditioning is such that it qualifies as a process load. So you would be able to exclude it. If this is a large refrigerated area then this protocol will apply under v4 - https://www.gcca.org/resources/usgbc-leed-energy-modeling-guidelines-cold-storage-and-refrigerated-warehouses - see also LEED Interpretations #10424.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.