Applying MRp2 retrospectively
NC-v4 MRp2:Construction and demolition waste management planningposted by André Harms on
A potential LEED project in Addis Ababa, Ethiopia, had already begun demolition and some construction activities before a LEED AP was appointed.
waste generated from new construction
Mid-Rise-v4 MRc3:Construction waste managementposted by sue bryant on
If you are removing an existing building, can the waste from the building be counted if you are recycling it?
Map generation for submittals
Mid-Rise-v4 LTc2:Site selectionposted by Phil Vanderloo on
How is everyone generating maps for credit submittals required for bicycle networks, bus stops, intersections, open spaces, etc. Thanks
On-site or off-site separation
Homes-v4 MRc3:Construction waste managementposted by Amrit Kaur on
The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.
Logging requirement for 5 years
EBOM-v4 WEc4:Water meteringposted by Bo White on
What are the requirements for the 5 years of logging in terms of data and in terms of logging interval?
Option 2 - Excluding Demo
NC-v4 MRc5:Construction and demolition waste managementposted by Nathan Gauthier on
The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie
Option 2 - Based on GSF, excluding garage area but including garage CDW?
NC-v4 MRc5:Construction and demolition waste managementposted by Michelle Bombeck on
It appears that the for Option 2, teams must calculate the total waste generated for the project which might include construction of a garage or other site feature that would not be included in the
ASHRAE 209-2018 and the LEED v4.1beta Integrative Process credit
posted by Rand Ekman on
Friends,
Lighting Controls - ASHRAE 90.1
NC-v4 EAp2:Minimum energy performanceposted by Esteban Martinez on
Hello