Forum quick links
Curtain Wall in the 4 sides of an existing building
CI-v4 EAp2:Minimum energy performanceposted by Carlos Dobobuto on
Hi all
LEED V4 CI
Pilot-Credits WEpc110:Water Restoration Certificates®posted by Pamela Mendez on
I am working on a LEED v4 ID+C Commercial Interiors /Fit-Out project that is pursuing this Pilot credit.
Do we use the Annual Baseline or Design Water Consumption ?
LT C6 - peak visitors
CS-v4 LTc6:Bicycle facilitiesposted by Maria Peralta on
Hello!,
I have a question regarding peak visitors.
I am wondering if this number of visitors are calculated in one time of the day or in a period of time of the day.
Building-level energy metering
NC-v4 EAp3:Building-level energy meteringposted by Tim Hemsath on
How does USGBC enforce the commitment to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered)...
ESC Plan For A Warehouse Project
NC-v4 SSp1:Construction activity pollution preventionposted by Jourdan Younis on
Hello,
v4_Low Emitting Materials Calculator
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Thomas Bennett on
I am trying to fill out this LEED calculator for the 5 HVAC materials that we are using on a project, 440 Gasket Tape, Duct Sealant DP1015, Oatey No 5.
Mandatory Requirements and Applicable Exceptions: Section 8.1.5
CI-v4 EAp2:Minimum energy performanceposted by Waleed AlGhamdi on
In a LEED v4 CI project, we have a floor that will architecturally stay the same. New HVAC and new lighting fixtures (same ceiling and placement though).
Daylight simulation
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Danielle Waters on
If a project is running a simulation that shows the LUX color levels for each room on the plan, would the project have to still fill out a v2009 Daylight calculator?