EDP database - useful format
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Przemysław Rejczak on
Hi,
I am looking for a EPD database for Eurpoe with some useful format such as CSV, so I can use it to calculations
Do you know if such database exist and how to get it?
Power factor
NC-v4.1 EAc3:Advanced Energy Meteringposted by Jeyaraj Kaliranjan on
Is it nessessary to maintain the power factor or it is enough to record the power factor which is achieved by the project.?
WE Calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Josef Kevin Palmiano on
Hi everyone!
Borrowing credit from Homes Design and Cronstruction
NC-v4 EAc5:Renewable energy productionposted by Michael J Turner on
Hello,
We are using LEED V4 BD+C, and we achived a credit listed within the LEED Homes Design and Construction; specifically the EA Credit: Active Solar-Ready Design.
MRpc109: Building Material Human Hazard & Exposure Assessment - Documentation
Pilot-Credits MRpc109:Building Material Human Hazard & Exposure Assessmentposted by Becky Baumer on
Hello. I am gathering data to submit for this pilot credit. What have you found to be the best method to document that there has been a validated Hazard Assessment on the product?
Wood decking
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Heather Holdridge on
I recently received LEED review team comments on this credit. We have interior "bridge" walkways that include wood decking on the underside. The LEED review team asked us to include thi
Entryway systems for delivery
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Christine Recke on
Hi everyone,
we have a project that includes a delivery entry, which is only used by the responsible service staff for the delivery operation.
Previously Developed - Golf course
NC-v4 LTc2:Sensitive land protectionposted by PJ Ryan on
Hi,
I'm working on the LEED certification of a development located on land formerly used as a golf course.
Would this be considerd to be 'previously developed'?
Gross floor area modification
CS-2009 PIf2:Project Summary Detailsposted by Silvia Ruiz on
Hi If a project size is modified (the gross floor area) after the preliminary review, besides of the credits that have been attempted what other consequences do I have to consider? Thanks