Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Reclaimed Material as Diverted Waste

NC-2009 MRc2:Construction Waste Management
posted by  Jeannie Rhoden  on 

We used a quarry as an end user where we hauled land clearing debris and dirt/rubble. It has been reclaimed and used as quarry fill. Can this be considered diverted waste?

0

Occupancy before building is finished

NC-2009 PIf4:Schedule and Overview Documents
posted by  Victoria Rios Esteve  on 

Hi everyone! Im pretty sure this question is not rightly set in this category, but here we go...

1
Fri Jul 3, 2020, 1:29 pm

BUG rating method

NC-v4 SSc6:Light pollution reduction
posted by  Michael Smolyansky  on 

1. Question for SSc6 Table 3 : What is meaning "All other luminaires" in Allowed glare rating chapter? Does it mean all luminaires in site oriened properly or not should meet this "G" criteria?

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Jun 26, 2020, 1:28 pm

CxA : independance of the design team

NC-v4 EAc1:Enhanced commissioning
posted by  Audrey LEDESERT  on 

In our office, we have 2 separate departments : one that works in building technicals (HVAC/San) and the 2nd that make consulting.

1
Thu Jun 25, 2020, 1:06 pm

Definitions for areas excluded in calculations?

NC-v4 WEp1:Outdoor water use reduction
posted by  Elizabeth Powers  on 

Both WEp1 and WEc1 state: "The following landscape types may be included or excluded from landscape calculations: vegetated playgrounds, athletic fields, food gardens, and urban agricultural areas.

4
Default Avatar
Project Manager
LEEDuser Basic Member
14 thumbs up
Thu Jun 25, 2020, 6:46 am

LEED v4 Regional Priority Credits?

NC-v4 RPc1:Regional priority
posted by  Chad Mapp  on 

I am looking to confirm what the Regional Priority credits are for LEED v4. However, I am unable to find any confirmation of the LEED v4 regional priority credits on the USGBC website.

6
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Jun 25, 2020, 4:40 am

Certified Multi-Attribute Products & Materials Pilot Credit

Pilot-Credits MRpc112:Certified Multi-attribute Products and Materials
posted by  Patty Lloyd  on 

I have attempted this credit on a second project as well as receiving review comments on the first project.  

0

LEED CI V4 Energy Model, 2 Floors

CI-v4 EAp2:Minimum energy performance
posted by  SSN Energy Model  on 
Hi, I am doing the energy simulation for LEED CI v4 Rating.
14
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 24, 2020, 1:26 pm

Energy Modeling for Addition to Existing LEED NC-2009

NC-v4 EAp2:Minimum energy performance
posted by  Joe Cavanaugh  on 

Our proposed project is to add about 30,000 square feet to an existing 55,000 square foot University science building.  The existing building is LEED Gold under NC-2009.  We hope to

1
Fri Jun 26, 2020, 1:17 pm