Forum quick links
run off volume calculation methodology - help needed
CS-v4.1 SSc4:Rainwater Managementposted by Konstantina Kalliakoudi on
Hello to all Leed users,
I am new at this credit. I have a project in which I want to implement Option 1.
Potential Greenbuild Panel opportunity
posted by Seonhee Kim on
Passing on the request from USGBC Regional director:
Need to clarify about energy simulation
CI-v4 EAc2:Optimize energy performanceposted by Nagaraj Sankar on
Use of alternative water source
CI-v4.1 WEc1:Indoor Water Use Reductionposted by Pui Nang Benny Au on
On our site, seawater has been used for flushing instead of potable water, does it count as water-saving under LEED CI?
Connection with WELL
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by John Bello on
I think a good option for this credit would be to include a section where affiliated WELL credits can be referenced and merited accordingly.
Flush out for building without mechanical ventilation
NC-v4 EQc4:Indoor air quality assessmentposted by Ivan Acosta on
Hey, I am working on a office project which will have no mechanical ventilation, and where it was decided to persue the flush out path for "IEQc4 Indoor Air quality Assessment".
Water Conservation Showcase 2023 - CA
posted by Orrin Goldsby on
Hi All,
Not sure if this is the right location for this (as I'm a new member) but we're Planning the upcoming Water Conservation Showcase in Northern CA. Some details below
Senior Consultant
posted by Rebecca Rice on
Greenwood Consulting Group is hiring!
About the job
Project changes
NC-v4.1 SSc5:Heat Island Reductionposted by Jordi Castellano on
I have a question regarding the changes that can occur between the design phase and the construction phase: