Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

run off volume calculation methodology - help needed

CS-v4.1 SSc4:Rainwater Management
posted by  Konstantina Kalliakoudi  on 

Hello to all Leed users,

I am new at this credit. I have a project in which I want to implement Option 1.

1
Wed May 8, 2024, 8:45 pm

Potential Greenbuild Panel opportunity

SD Leaders
posted by  Seonhee Kim  on 

Passing on the request from USGBC Regional director:

1
Fri Jan 20, 2023, 7:58 pm
2
Fri Jan 20, 2023, 4:09 am

Need to clarify about energy simulation

CI-v4 EAc2:Optimize energy performance
posted by  Nagaraj Sankar  on 
Hi all, On one of our project having 8 floors that was occupied in only 4 th floor undergone with system 8 for Energy
0

Use of alternative water source

CI-v4.1 WEc1:Indoor Water Use Reduction
posted by  Pui Nang Benny Au  on 

On our site, seawater has been used for flushing instead of potable water, does it count as water-saving under LEED CI?

1
Fri Mar 3, 2023, 1:35 am

Connection with WELL

Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environment
posted by  John Bello  on 

I think a good option for this credit would be to include a section where affiliated WELL credits can be referenced and merited accordingly.

8
Senior Consultant
Greenwood Consulting Group
LEEDuser Premium Member
4 thumbs up
Thu Jan 19, 2023, 9:40 pm

Flush out for building without mechanical ventilation

NC-v4 EQc4:Indoor air quality assessment
posted by  Ivan Acosta  on 

Hey, I am working on a office project which will have no mechanical ventilation, and where it was decided to persue the flush out path for "IEQc4 Indoor Air quality Assessment".

2
Thu Jan 19, 2023, 11:26 am

Water Conservation Showcase 2023 - CA

Green Commons
posted by  Orrin Goldsby  on 

Hi All, 

Not sure if this is the right location for this (as I'm a new member) but we're Planning the upcoming Water Conservation Showcase in Northern CA. Some details below

0

Senior Consultant

Help Wanted: LEED-related Jobs
posted by  Rebecca Rice  on 

Greenwood Consulting Group is hiring! 

About the job

0

Project changes

NC-v4.1 SSc5:Heat Island Reduction
posted by  Jordi Castellano  on 

I have a question regarding the changes that can occur between the design phase and the construction phase:

1
Fri Jun 30, 2023, 5:04 am