Forum quick links
Model the Additional Lighting allowances for baseline and proposed cases
CI-v4 EAp2:Minimum energy performanceposted by Michael on
My jewelry store (100m2) has general lighting on the ceiling and millwork lighting for decorative purposes. The general lighting is 16W/m2 compared to the baseline of 18 W/m2.
ASHRAE 90.1:2010 Pipping insulation Table, note d. direct-buried heating and hot-water systems piping
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hello,
HVAC Background Noise Measurement - must be done by Acoustic Consultant?
NC-v4.1 EQc9:Acoustic Performanceposted by Eunice Chong on
Hi fellow LEED experts,
Where to find Evapotranspiration Rates of a location?
NC-v4 WEc1:Outdoor water use reductionposted by Zirjay Villanueva on
In the v4_Outdoor Water Use Reduction Calculator, there is a tab where you need to key in the Monthly Rainfall and Evaportranspiration Rate (ETo) for the location of the project.
LPA Sustainable Design Specialist
posted by Ellen Mitchell on
Since starting at LPA last fall, the number one question I get from people outside the firm is how we are hitting (2018-2019) or getting so close to hitting the 2030 Commitment goals.
Formaldehyde and Urea-Formaldehyde
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Abdulrahman Sherazy on
What I believe is there is a different between the formaldehyde and urea as a unique substances and the composite of urea-formaldehyde.
Lighting Mandatory Provision in Tenant space
CS-v4 EAp2:Minimum energy performanceposted by Teerawat W. on
Our project is a core and shell office. The owners are provided with complete lighting fixtures in the tenant space (shell).
Major Renovation Project- Spaces out of Scope of Work
NC-v4 EQp1:Minimum indoor air quality performanceposted by Zeynep Cakir on
Hello everyone,
My question is related to major renovation projects. Are the spaces not undergoing renovation and out of scope of renovation work exempt from the credit requirements?
Need to get clear Idea about requirement of Enhanced IAQ
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Nagaraj Sankar on
In Office space buildings, in Enhanced Indoor Air quality strategies, Interior cross contamination prevention, LEED credit says “need to create negative pressure with respect to adjacent spaces whe
Advocacy Opportunity-2021 Seattle Building Code Embodied Carbon Proposals (Looking for Supporters)
posted by David Winans on
As announced in last week's SDL/SCL Winter Summit, I have been working with a group of regional AEC professionals, industry stakeholders, and the New Buildings I