Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

3rd Party Verified Manufacturer Inventory & Product Lens?

NC-v4.1 MRc4:Material Ingredients
posted by  Katrina Kashinejad  on 

Hello,

   I'm looking for confirmation on what counts as 3rd Party Verification for these two types of Material Ingredient Reports:

1
Mon Dec 18, 2023, 4:43 pm

Documentation after EPD threshold reached

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Andrea Vickers  on 

Hi - I thought I had found somewhere that LEED requires you to continue counting products with EPDs (applies to HPDs/materials ingredients as well) even after you reach the threshold targ

1
Fri Dec 8, 2023, 5:00 pm

Chlorine Flush vs. IAQ Assessment

NC-v4.1 EQc4:Indoor Air Quality Assessment
posted by  Mike Bahr  on 

Has anyone here done an IAQ assessment around the same time as a chlorine flush of the domestic water system and plumbing fixtures?

1
Tue Jan 16, 2024, 8:47 pm

Change of space during performance period

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Pulak Goyal  on 

I have a building going for LEED O+M v4.1 Existing Buildings Certification. 

0

(mis)Understanding the LEED Review (and appeal) process

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susannah Goddard  on 

We have recently undergone the Final Design Stage Review and have some credits 'denied'.

9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 7, 2023, 8:28 pm

Bird glazing that meets quality views credit requirements

NC-v4 EQc8:Quality views
posted by  Blake Weaver  on 

I have an owner that is interested in installing bird glazing for their Airport project. We are pursuing the quality view credit which somewhat limits our options for bird safe glazing.

1
Thu Apr 18, 2024, 12:57 am

Baseline HVAC, Non-regulated loads and Exceptional Calculation Method for V4.1

NC-v4.1 EAp2:Minimum Energy Performance
posted by     on 

A 156,000 SF pharmaceutical production facility wants to pursue LEED v4.1.  Building breakdown as follows:

1
Fri Apr 5, 2024, 2:12 pm

Meeting the credit intent

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Jon Hall  on 

The credit intent states the following: Encourage any and all members of the project team to promote and further social equity by integrating strategies that address identified social and economic

2
Associate
Thornton Tomasetti
LEEDuser Premium Member
3 thumbs up
Wed Dec 6, 2023, 10:52 pm

Project phases vs LEED certification approach?

LEED Guidance for Campuses and Multiple Buildings
posted by  Ehsan Baharvand  on 

Dear all, I'm wondering what certification approach I can propose for a poduction site consisting of 3 construction phases (like building extensions over different period of time): phase 1 was bui

2
Default Avatar
LEEDuser Basic Member
0 thumbs up
Wed Dec 6, 2023, 8:31 pm