Forum quick links
50% surface area reuse
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Mark Ragucci on
how is this credit calculated? can in include existing floor slab and deck? we are leaving a portion of the exiting walls that are about 20ft tall and our ceilings will be at 9'.
Backup Documentation
NC-v4 WEc4:Water meteringposted by Michelle Rosenberger on
It seems that many credits no longer ask for any backup to be uploaded. Including this one. This lack makes us uncomfortable because we've always uploaded plans sheets.
Building will be used by the client, not be leased to 3rd party. need of "tenant design & construction guidelines document"?
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by prudhvi mahadev on
hello,
Natural Slate vs. alternatives question
posted by Mary Ann Lazarus on
Hi Brilliant People:
Consideration of Manmade Ponds in Protect or Restore Habitat Credit Calculations.
NC-v4.1 SSc2:Protect or Restore Habitatposted by Subhashkumar A on
In one of our project, the site includes man-made ponds, which are used as rainwater storage ponds.
What is the Exact Definition of A Trip?
NC-v4 LTc5:Access to quality transitposted by Krithikha Muthukrishnan on
I am posting this question largely because the credit langauage is not very clear(maybe language nativity issues here). In the Reference Guide, "A Trip" is defined as follows-
Preheat coil requirement in baseline
NC-v4.1 EAp2:Minimum Energy Performanceposted by Samer Hassanie on
Hi,
It is not clear from G3.1.3.19 where the preheat coil should be placed.
Is it upstream or downstream the economizer and the heat exchanger?
Energy modeling on small projects / Passive design approach vs calculating EUI
posted by Simona Fischer on
I'm working with the AIA Minneapolis chapter on guidance for small firms related to how and when to energy model.
Off-street parking provided is less than minimum required spaces for EV-ready.
NC-v4.1 LTc8:Electric Vehiclesposted by Erica Downs on
Our project only has 5 parking spaces (all off street), and these are for employees only (FTE = 6), including one HC space.