entryway systems for trucks
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Florian Schmidtchen on
In a manufacturing facility we have trucks and fork lift trucks entering the buildings.
What happens when you 'skip final design review'?
posted by Valerie Molinski on
I've never been in this situation before, and I don't want to hit the button and 'wait and see.' i have a project where we were doing a split submittal.
Sample Commisioned Projects Criteria
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jalal Avades on
What are the requirements/criteria to meet the 'Representative Projects'?
New to AGMBC
posted by Anthea Ng on
Hi everyone, here is a new comer of LEEDuser. Umm... after reading the LEED online block set up instruction, grateful if I could have more rigid advices.
EBOM and multiple buildings
posted by Kathleen Burke on
It should not be this complicated-i hae 2 office buildings with parking below. One building is 3 stories and the other is 8-do i have to register each of these separately or?
Sustainable Site Regional Priority Credit
CI-2009 SSc1:Site Selectionposted by Dana Hodges on
I am working on a project in a region where the regional priority credits include SSC1 paths, C, E, G, H, and L, but do NOT include path A - selecting a LEED certified building.
Non-Motorized Right-of-Way
Pilot-Credits PC14:Walkable Streetsposted by Andrew Greene on
Two items: 1) A clarification of the language on non-motorized rights-of-way guidance. 2) A question whether the minimum height ratio is an appropriate measure of walkability in campus settings. 1
Certified Wood: Multiple buildings = Multiple invoices?
NC-2009 MRc7:Certified Woodposted by Paola Figueiredo on
Hello! I'm working on a multiple-building project using AGMBC (an industrial facility).
IDC Materials Resources Calculator not calculating correctly
CI-2009 MRc4:Recycled Contentposted by Mason Radkoff on
I'm using the "IDC Material and Resource Calculator (June 2012).xls" that's downloadable from the MRc4 Credit Resources page.
Activity Date in CMP
posted by Ramesh Narayanan on
I would like to submit the CE hours using activity delivery method of LEED project participation . I would like to know what is the ACTIVITY DATE (MM/DD/YY) for LEED project participation.