Hi, I was wondering if post industrial waste is included by default in the recycling plan required by the MR prerequisite. If it didn't, adding this waste to a comprehensive plan may be an option for an innovation in design credit, would you agree? Thanks.

2

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 08/30/2012 - 16:02

Nadia, a recycling plan is not required for MRp1 so any kind of plan already goes beyond the prereq.Your best bet would be to use one of the LEED-EBOM solid waste management credits as a model, and either stick with the scope of one or more of those credits, or expand on it, using similar methodology.