Forum quick links
Bicycle network distance to entrance
NC-v4 LTc5:Access to quality transitposted by Ricardo Sá on
I'm working on a project that consists of a new office building that will be constructed on top of an existing shopping center.
Previously Developed and Greenfield Site
CS-2009 SSc2:Development Density and Community Connectivityposted by Michelle Rosenberger on
Our project is on a large master planned site. Parts of the site had single family homes and fuel tanks years ago.
Made to measure Furniture
NC-v4 EQc2:Low emitting materialsposted by Charline SEYTIER on
Our client is willing to install made to measure furniture that will be composed of elements from 2 pieces of furniture that meet the credit requirements.
Cooling Towers
CI-v4 EAp3:Fundamental refrigerant managementposted by Laura Charlier on
If cooling tower is being replaced as part of project, does that need to be included in calcs?
What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?
EBOM-v4 MPR3:Must comply with project size requirementsposted by Xiaoyu Cao on
Hi,
I see the minimum size requirements for BD+C and O+M is ,
"LEED BD+C and LEED O+M Rating Systems
Walkable Project Site
NC-v4 INc1:Innovationposted by Quentin Jackson on
Hi all,
I'm working on a stadium project in Australia and we're looking at the walkable project site innovation credit.
Metering individual end uses >10%
NC-v4 EAc3:Advanced energy meteringposted by Carmen Mielecke on
Hello good morming, I would like to discuss the following example: If the simulation result on building level is, that the end use of lighting is >10% and the end use of user eq
2-year contract from what time?
NC-2009 EAc6:Green powerposted by Maria Porter on
I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case?