NC-v4 WEc3:Cooling tower water use

Pilot - No Cooling Tower

Hello

I am working on a project that includes 3 baseline energy systems, one of which is System 7.

To qualify for the pilot, it is enough to ensure that System 7 is included as part of the baseline model, or would System 7 and/or 8 need be the only baseline systems?

Thanks!

 

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 01/11/2018 - 20:54

I would assume that you could still pursue the credit if at least one area of the building qualified with the System 7 baseline. The pilot doesn't otherwise have a magnitude of impact requirement. You may have already seen it but it looks like ASHRAE 90.1 has specific guidance around when more than 1 baseline can apply to a building. See G3.1.1 Exceptions (a) and in the notes for Table G3.1.1A of the standard

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.